Show on map
Kettering Solar 2 — Power plant · Solar · Tesla Inc.Portal Ridge Solar A, LLC — Postponed · Solar · CA · 19 MW · 7.8 mi awayPalmdale Water District HQ — Under construction · Solar · CA · 1.7 MW · 8.0 mi awayTierra Bonita Solar — Postponed · Solar · CA · 22 MW · 8.4 mi awayPalmdale Water District 6MG Tank — Under construction · Solar + storage · CA · 1.3 MW · 9.8 mi awayAntelope Solar Farm — Postponed · Solar · CA · 20 MW · 11.6 mi awayBig Creek Solar LLC — Under construction · Solar · AR · 400 MW · 14.8 mi awayWillow Rock Energy Storage Center — Contracted · Storage · CA · 500 MW · 14.8 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Kettering Solar 2

Power plant · Solar

Key facts

Power plant · Solarran 16% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2014
Net generation, 2025
1,428 MWh
Grid
0.5 kV to Southern California Edison Co (CISO)
Location
Los Angeles County, California
Operated by
Tesla Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2014 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
12 years since 2014
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816364
Location id
L100000813649
Eia plant ids
59099
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
0.500
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20254,872
Capacity factor, 20250.163
Net generation (MWh), 20251,428
Balancing authority codeCISO

Solar array

Array area (acres)
2.5
AC capacity (MW)
1
DC capacity (MW)
1.1
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2014

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Portal Ridge Solar A, LLC Postponed Solar 7.8 mi 19
Palmdale Water District HQ Under construction Solar 8.0 mi 1.7
Tierra Bonita Solar Postponed Solar 8.4 mi 22
Palmdale Water District 6MG Tank Under construction Solar + storage 9.8 mi 1.3
Antelope Solar Farm Postponed Solar 11.6 mi 20
Big Creek Solar LLC Under construction Solar 14.8 mi 400
Willow Rock Energy Storage Center Contracted Storage 14.8 mi 500

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 12, 2026Source: California ISO

Attribution