- Storage
- Bioenergy
- Under construction
- Retired
- 10 · 100 · 1,000 MW
Map
- Storage
- Bioenergy
- Under construction
- Retired
LIRR Malverne Wayside Energy Storage Sys: location and 22 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
LIRR Malverne Wayside Energy Storage Sys
Power plant · Storage
Key facts
Power plant · Storage Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2014
- Location
- Nassau County, New York
- Operated by
- Electrical Power worX CorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 12 years since 2014
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | NYIS |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- June 2015
- Capacity retired
- 2 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| BA1 | Batteries | 1 MW | Retired | June 2015 |
| BA2 | Batteries | 1 MW | Retired | June 2015 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- NYIS
Transmission lines within 15 mi (3)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units BA1, BA2 scheduled to retire, 2 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · LBNL · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Hecate Grid Intrepid Postponed | Storage | 4.0 mi | 300 |
| Plant No 1 Freeport Under construction | Biomass | 4.4 mi | 3 |
| Kennedy International Airport Cogen Postponed | Gas, combustion turbine | 6.0 mi | 50 |
| Water Willow A Clean Energy LLC Under construction | Storage | 6.0 mi | 3.9 |
| Water Willow B Clean Energy LLC Under construction | Storage | 6.0 mi | 3.9 |
| Coral Honeysuckle Clean Energy LLC Under construction | Storage | 7.7 mi | 3.7 |
| Linden Clean Energy, LLC Under construction | Storage | 7.7 mi | 3.7 |
| Roseate Tern Clean Energy LLC Under construction | Storage | 11.5 mi | 3.3 |
| Blue Aster B Clean Energy LLC Under construction | Storage | 11.9 mi | 4.9 |
| Blue Aster Clean Energy LLC Under construction | Storage | 11.9 mi | 4.9 |
| Blue Aster C Clean Energy LLC Under construction | Storage | 11.9 mi | 4.9 |
| Jamaica Community Energy, LLC Under construction | Storage | 13.6 mi | 4.9 |
| Piping Plover Clean Energy, LLC Under construction | Storage | 13.8 mi | 2.3 |
| Warbler Clean Energy LLC Under construction | Storage | 13.8 mi | 2.3 |
| Bensonhurst Energy Storage 1 LLC Under construction | Storage | 14.0 mi | 5 |
| Heron Clean Energy, LLC Under construction | Storage | 14.2 mi | 4.9 |
| Farmingdale Fuel Cell Postponed | Gas, other | 14.4 mi | 1.4 |
| Astoria Gas Turbines Postponed | Gas, combustion turbine | 14.4 mi | 431 |
| Wintergreen Clean Energy, LLC Under construction | Storage | 14.8 mi | 4.9 |
| Wintergreen C Clean Energy LLC Under construction | Storage | 14.8 mi | 4.9 |
| Wintergreen B Clean Energy LLC Under construction | Storage | 14.8 mi | 4.9 |
| Wintergreen D Clean Energy LLC Under construction | Storage | 14.8 mi | 4.9 |
Sources EIA-860M