Show on map
- Clean firm
- Wind & solar
- Storage
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Clean firm
- Wind & solar
- Storage
- Under construction
- Other infrastructure
Los Coches - Miguel 230 kV: route and 9 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Los Coches - Miguel 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-CA
- Owner (as stated)
- San Diego Gas Electric
Details
Who’s behind it
- Owner
- San Diego Gas Electric
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 16
- Substations at the ends (as the source names them)
- Los Coches to Miguel
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | san diego gas electric |
| HIFLD line ID | 312126 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| EnerSmart El Cajon BESS Postponed | Storage | 1.9 mi | 3 |
| EnerSmart Murray BESS Postponed | Storage | 7.0 mi | 21 |
| Alvarado Hydro Facility Postponed | Hydro | 7.5 mi | 1.4 |
| CA National City Terminal Ave Under construction | Solar | 8.0 mi | 1.1 |
| EnerSmart Imperial Beach BESS Postponed | Storage | 9.3 mi | 6 |
| Pomerado Energy Storage, LLC Postponed | Storage | 9.9 mi | 6 |
| L3 Harris San Diego Under construction | Solar | 13.1 mi | 1.6 |
| Rancho Penasquitos Under construction | Hydro | 13.5 mi | 4.3 |
| EnerSmart Mesa Heights Sub Station Under construction | Storage | 13.8 mi | 3 |
Sources EIA-860M