Show on map
- Combustion
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
Malburg: location and 14 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Malburg
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 27% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2005
- Net generation, 2025
- 310,436 MWh
- Grid
- 66 kV to City of Vernon (CISO)
- Location
- Los Angeles County, California
- Operated by
- City of Vernon - (CA)
Output
- Gas
- Biomass and waste
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 21 years since 2005
- Unused energy
- 828 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 8,867 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 2,752,612 |
| Capacity factor, 2025 | 0.273 |
| Heat rate (Btu/kWh), 2025 | 8,866.9 |
| Net generation (MWh), 2025 | 310,436 |
| Balancing authority code | CISO |
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| City of Vernon - (CA) | Operator | EIA-860M | ||
| CITY OF VERNON CALIFORNIA | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| PRIME DATA CENTER VERNON Built | Large load | 0.9 km | |
| LATTC South Campus Solar Postponed | Solar | 5.8 km | 1.1 |
| Bandini - SLLAX710 Under construction | Solar | 8.2 km | 1.3 |
| Glenarm BESS Plant Filed | Storage | 15.9 km | 25 |
| CPA 3777 Workman Postponed | Solar | 16.9 km | 1.9 |
| South Bay Dis Ctr 6-SLLAX680 Under construction | Solar | 17.2 km | 1.3 |
| Fordyce - SLLAX680 Under construction | Solar | 17.2 km | 1.3 |
| South Bay Dis Ctr 12 - SLLAX104 Under construction | Solar | 17.3 km | 1.2 |
| Dominguez - SLLAX512 Under construction | Solar | 17.6 km | 1.3 |
| Scholl Canyon Under construction | Biomass | 17.7 km | 12 |
| California Institute of Technology Postponed | Gas, combined cycle | 17.9 km | 16.5 |
| Torrance Dis Ctr 2 - SLLAX100 Under construction | Solar | 19.2 km | 1.4 |
| Watson Cogeneration Withdrawn | Gas, combined cycle | 20.3 km | 94.2 |
| Scattergood Postponed | Gas, combined cycle | 21.0 km | 346 |