Maxim — Power plant · Gas, other · Bloom Energy
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, other

Key facts

Power plant · Gas, otherran 72% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2014
Net generation, 2025
6,948 MWh
Grid
21 kV to Pacific Gas & Electric Co (CISO)
Location
Santa Clara County, California
Operated by
Bloom Energy

Operations

Net generation, 2025
6,948MWh
Fuel burned, 2025
46,413MMBtu
Capacity factor, 2025
72.1%
Heat rate, 2025
6,680Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
20256,94846,41372.1%6,680
20245,95748,01961.7%8,061
20236,557492,94168.0%—
20227,35554,70576.3%7,438
20217,33655,18576.1%7,522
20207,11754,33573.7%7,634
20197,17261,55674.4%8,583
20187,21554,10174.9%7,498
20177,9488,18782.5%—
20168,12861,30284.1%7,542
20159,36866,00897.2%7,046
2014 (5 of 12 months)3,85425,867—6,712
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.