Show on map
Maxim — Power plant · Gas, other · Bloom EnergyEDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT — Large load · CA · 2.8 km awayEdgecore -3580 — Large load · CA · 2.8 km awaySJC02 & SJC03 DATA CENTER — Large load · CA · 2.9 km awayLBA Data Center West — Large load · CA · 3.0 km awayKifer BESS 1 — Storage · CA · 50 MW · 3.3 km away4054 Digital Realty — Large load · CA · 3.7 km awaySV8 DATA CENTER — Large load · CA · 3.7 km awayVANTAGE DATA CENTERS MANAGEMENT CO , LLC — Large load · CA · 4.1 km awayPRIME DATA CENTERS — Large load · CA · 4.5 km away1200 Memorex Skybox Data Center — Large load · CA · 4.6 km awaySKYBOX DATA CENTER — Large load · CA · 4.8 km away888 Ross Data Center — Large load · CA · 7.4 km awayDC-N (San Jose data centre) — Large load · CA · 8.7 km awayFremont CA AutoFactory — Solar · CA · 3.8 MW · 9.7 km awayData Center — Large load · CA · 10.0 km awayWaste Management Tri-Cities LFGTE — Biomass · CA · 4.8 MW · 10.7 km away7999 Gateway Solar — Solar · CA · 4.6 MW · 15.1 km awayGateway#1&2 (Newark CA) — Solar · CA · 1.1 MW · 18.0 km awayCHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER — Large load · CA · 24.0 km awayEquinix SV-19 - 131 Great Oaks Blvd SJ — Large load · CA · 24.2 km away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, other

Key facts

Power plant · Gas, otherran 72% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2014
Net generation, 2025
6,948 MWh
Grid
21 kV to Pacific Gas & Electric Co (CISO)
Location
Santa Clara County, California
Operated by
Bloom Energy

Output

Net generation MWh by year, 2014 to 2025
Fuel burned MMBtu by year, 2014 to 2025
  • Gas

Operations detail

Details

Who’s behind it

Owner
Maxim

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, other source: “Other Natural Gas”
Age
12 years since 2014
Heat rate
6,680 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
21
Transmission owner
Pacific Gas & Electric Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 202546,413
Capacity factor, 20250.721
Heat rate (Btu/kWh), 20256,680.1
Net generation (MWh), 20256,948
Balancing authority codeCISO

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Bloom Energy Operator EIA-860M
Maxim Owner 100.0% 31 Dec 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT Unknown Large load 2.8 km
Edgecore -3580 Filed Large load 2.8 km
SJC02 & SJC03 DATA CENTER Unknown Large load 2.9 km
LBA Data Center West Filed Large load 3.0 km
Kifer BESS 1 Under construction Storage 3.3 km 50
4054 Digital Realty Built Large load 3.7 km
SV8 DATA CENTER Unknown Large load 3.7 km
VANTAGE DATA CENTERS MANAGEMENT CO , LLC Unknown Large load 4.1 km
PRIME DATA CENTERS Built Large load 4.5 km
1200 Memorex Skybox Data Center Filed Large load 4.6 km
SKYBOX DATA CENTER Built Large load 4.8 km
888 Ross Data Center Filed Large load 7.4 km
DC-N (San Jose data centre) Filed Large load 8.7 km
Fremont CA AutoFactory Under construction Solar 9.7 km 3.8
Data Center Filed Large load 10.0 km
Waste Management Tri-Cities LFGTE Postponed Biomass 10.7 km 4.8
7999 Gateway Solar Under construction Solar 15.1 km 4.6
Gateway#1&2 (Newark CA) Announced Solar 18.0 km 1.1
CHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER Unknown Large load 24.0 km
Equinix SV-19 - 131 Great Oaks Blvd SJ Filed Large load 24.2 km