Mesa Solar Array

Power plant · Solar

Key facts

Power plant · Solarran 3% of 2015 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2015
1,150 MWh
Grid
12 kV to Salt River Project (SRP)
Location
Maricopa County, Arizona
Operated by
Apple, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2015
1,150MWh
Fuel burned, 2015
10,716MMBtu
Capacity factor, 2015
3.3%
Heat rate, 2015
Not stated
Capacity factor % of full output, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
2016 (3 of 12 months)00——
20151,15010,7163.3%—
20145,15048,97614.7%—
2013 (10 of 12 months)5,19349,547——
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.