Mesa Solar Array
Power plant · Solar
Key facts
Power plant · Solarran 3% of 2015 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2013
- Net generation, 2015
- 1,150 MWh
- Grid
- 12 kV to Salt River Project (SRP)
- Location
- Maricopa County, Arizona
- Operated by
- Apple, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 13 years since 2013
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Balancing authority code | SRP |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 2.8
- AC capacity (MW)
- 4
- DC capacity (MW)
- 4.1
- Mounting
- Fixed tilt
- Site type
- Greenfield
- Began operating
- 2013
Source USPVDB
Source
- U.S. Large-Scale Solar Photovoltaic DatabaseMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- March 2016
- Capacity retired
- 4 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| MSA1 | Solar Photovoltaic | 4 MW | Retired | March 2016 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 12 kV
- Transmission or distribution system owner
- Salt River Project
- Balancing authority
- Salt River Project
- NERC region
- WECC
Transmission lines within 25 km (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit MSA1 scheduled to retire, 4 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- U.S. Large-Scale Solar Photovoltaic Database (USPVDB) — USGS and LBNL; one row per facility with its array footprintMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| PLATYPUS DEVELOPMENT Built | Large load | 0.2 km | |
| NTT Ph4 POINT 2 Filed | Large load | 1.2 km | |
| NTT PH1 DATA CENTER Under construction | Large load | 1.4 km | |
| EdgeCore Under construction | Large load | 1.8 km | |
| Mesa Data Center Under construction | Large load | 2.0 km | |
| MECP1 MESA INTERMEDIATE 1 Built | Large load | 2.4 km | |
| COMARCH PHOENIX DATA CENTER Built | Large load | 3.1 km | |
| NDA MESA DATA CENTER Built | Large load | 4.2 km | |
| Edged Data Center Filed | Large load | 4.2 km | |
| Edgeconnex Filed | Large load | 4.6 km | |
| NTT PH 5 Filed | Large load | 5.6 km | |
| AWS Data Center Filed | Large load | 5.8 km | |
| RED HAWK PH 3 (Mesa data centre) Filed | Large load | 6.8 km | |
| MICROSOFT PHX 16 DATA CENTER Under construction | Large load | 16.0 km | |
| Copper Crossing Energy and Research Cent Postponed | Gas, combustion turbine | 24.1 km | 1,779 |
Sources EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES · EIA-860M
Sources
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- EIA-860M Preliminary Monthly Electric Generator Inventory