Apple, Inc
Power plant owner
Key facts
Power plant owner · 96 MW- Capacity held
- 96MW
- Assets
- 8
- Projects
- 4
- States
- AZ, CA, NC
- Headquarters
- Cupertino, United States Source: Wikidata
- Listed
- Nasdaq: AAPL Source: SEC EDGAR
- LEI
- HWUPKR0MPOU8FGXBT394 Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why
Gross output of plants with a stake
8 of 8 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 8 of 8 plants with a stake: US plants with an EIA monthly series.100% of the output is from 8 plants recorded as wholly owned.8 plants: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Solar
- Bioenergy
Yearly totals
| Year | Solar | Bioenergy | Total (MWh) |
|---|---|---|---|
| 2025 | 118,220 | 31,263 | 149,483 |
| 2024 | 120,518 | 29,614 | 150,132 |
| 2023 | 127,279 | 25,933 | 153,212 |
| 2022 | 139,680 | 22,242 | 161,922 |
| 2021 | 135,538 | 69,707 | 205,245 |
| 2020 | 117,337 | 86,242 | 203,579 |
| 2019 | 124,768 | 78,230 | 202,998 |
| 2018 | 114,274 | 99,256 | 213,530 |
| 2017 | 119,298 | 93,437 | 212,735 |
| 2016 | 125,051 | 63,328 | 188,379 |
| 2015 | 78,896 | 59,436 | 138,332 |
| 2014 | 81,816 | 66,206 | 148,022 |
| 2013 | 52,460 | 65,314 | 117,774 |
| 2012 | 1,061 | 2,986 | 4,047 |
Sources EIA-860 · EIA-860M · EIA
Sources
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
Projects 4
Capacity
<0.01 GW
none active
2 load not summed
| Status | Name. Sort by name, A to Z | Type | MW, sorted descending. Sort by capacity, smallest first | State | Online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|
| Built | Apple, Inc. | Hydro | 3 MW | OR | Online 5 May 2015 | LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions) |
| Built | Apple, Inc | Hydro | 0.3 MW | OR | Online 19 Jun 2015 | LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions) |
| Built | APPLE INC | Large load | — | NV | — | EPA ICIS-Air |
| Built | APPLE INC. | Large load | — | NC | — | EPA ICIS-Air |
Assets 8
Assets
8
Capacity
96.0 MW
- Solar: 81.5 MW, 6 assets
- Biomass: 14.5 MW, 2 assets
Operates 8 power plants
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Held by |
|---|---|---|---|---|---|
| Apple Data Center PV | Solar | Operates | 21 MW | US-NC | Apple, Inc |
| Apple Data Center - PV2 | Solar | Operates | 20 MW | US-NC | Apple, Inc |
| Apple Data Center PV3 | Solar | Operates | 17.5 MW | US-NC | Apple, Inc |
| Apple Campus 2 PV | Solar | Operates | 14.4 MW | US-CA | Apple, Inc |
| Apple Data Center - Fuel Cell 1&2 | Biomass | Operates | 10.5 MW | US-NC | Apple, Inc |
| Mesa Carport PV | Solar | Operates | 4.6 MW | US-AZ | Apple, Inc |
| Apple Campus 2 Fuel Cell | Biomass | Operates | 4 MW | US-CA | Apple, Inc |
| Mesa Solar Array | Solar | Operates | 4 MW | US-AZ | Apple, Inc |
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Sources 7
Registers
7
Reuse terms
- 5 Open license
- 2 Open license, with credit
Latest read
2026-11-08
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Berkeley Lab ·
LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)
Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. · license
Publication page https://eta-publications.lbl.gov/publications/queued-2026-edition-characteristics, retrieved 2026-10-23 (HTTP 200) — "Copyright Notice: The Queued Up data file is licensed CC BY 4.0. You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." and "Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. CC BY 4.0. All rights reserved." The file's Introduction sheet adds the DOE contract notice ("This dataset has been authored by an author at Lawrence Berkeley National Laboratory under Contract No. DE-AC02-05CH11231 with the U.S. Department of Energy ...") and the standard no-warranty disclaimer
-
View at source →
EPA ICIS-Air ·
EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
US federal work — public domain, 17 U.S.C. §105 (docs/13 §2.12 EPA hedge applies)
-
View at source →
EPA ICIS-Air ·
EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
US federal work — public domain, 17 U.S.C. §105 (docs/13 §2.12 EPA hedge applies)
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
-
View at source →
SEC EDGAR ·
SEC EDGAR company tickers with exchange (company_tickers_exchange.json — CIK, EDGAR conformed name, ticker, exchange)
Source: U.S. Securities and Exchange Commission, EDGAR · license
SEC website, "Privacy and Information Security" (https://www.sec.gov/about/privacy-information, read 2026-10-22), Website Dissemination: "Information presented on sec.gov is considered public information and may be copied or further distributed by users of the web site without the SEC’s permission. Please consider appropriate citation to the SEC as the source." SEC "Accessing EDGAR Data" (https://www.sec.gov/search-filings/edgar-search-assistance/accessing-edgar-data, read 2026-10-22): "Current max request rate: 10 requests/second."; "Please declare your user agent in request headers: Sample Declared Bot Request Headers: User-Agent: Sample Company Name AdminContact@<sample company domain>.com"; on this file: "We periodically update these files to provide functionality for EDGAR searches, but do not guarantee accuracy or scope." A compilation by a federal agency (17 U.S.C. §105).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 45
within 25 kmProjects
45
within 25 km
Nearest
0.1 km
PLATYPUS DEVELOPMENT
All 45NearbyShowing all 45 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Built | PLATYPUS DEVELOPMENT | Large load | — | 0.1 km away | nearest: Mesa Carport PV |
| Built | APPLE INC. | Large load | — | 0.4 km away | nearest: Apple Data Center PV |
| Under construction | CLT04 LYLE CREEK DATA CENTER | Large load | — | 1.1 km away | nearest: Apple Data Center - PV2 |
| Filed | NTT Ph4 POINT 2 | Large load | — | 1.2 km away | nearest: Mesa Solar Array |
| Under construction | NTT PH1 DATA CENTER | Large load | — | 1.4 km away | nearest: Mesa Solar Array |
| Under construction | EdgeCore | Large load | — | 1.8 km away | nearest: Mesa Solar Array |
| Built | MICROSOFT CORPORATION, CLT10 | Large load | — | 1.9 km away | nearest: Apple Data Center PV |
| Under construction | Mesa Data Center | Large load | — | 2.0 km away | nearest: Mesa Solar Array |
| Built | MECP1 MESA INTERMEDIATE 1 | Large load | — | 2.4 km away | nearest: Mesa Solar Array |
| Built | COMARCH PHOENIX DATA CENTER | Large load | — | 3.1 km away | nearest: Mesa Solar Array |
| Postponed | RJ Solar | Solar | 5 MW | 3.2 km away | nearest: Apple Data Center PV3 |
| Built | NDA MESA DATA CENTER | Large load | — | 4.2 km away | nearest: Mesa Solar Array |
| Filed | Edged Data Center | Large load | — | 4.2 km away | nearest: Mesa Solar Array |
| Filed | Edgeconnex | Large load | — | 4.6 km away | nearest: Mesa Solar Array |
| Built | MICROSOFT CORPORATION, CLT17 | Large load | — | 5.6 km away | nearest: Apple Data Center - Fuel Cell 1&2 |
| Filed | NTT PH 5 | Large load | — | 5.6 km away | nearest: Mesa Solar Array |
| Filed | AWS Data Center | Large load | — | 5.8 km away | nearest: Mesa Solar Array |
| Built | PRIME DATA CENTERS | Large load | — | 5.8 km away | nearest: Apple Campus 2 PV |
| Unknown | VANTAGE DATA CENTERS MANAGEMENT CO , LLC | Large load | — | 5.9 km away | nearest: Apple Campus 2 PV |
| Filed | 1200 Memorex Skybox Data Center | Large load | — | 6.0 km away | nearest: Apple Campus 2 PV |
| Filed | Clark Creek Solar Plant | Solar + storage | 54 MW | 6.2 km away | nearest: Apple Data Center PV |
| Unknown | SV8 DATA CENTER | Large load | — | 6.3 km away | nearest: Apple Campus 2 PV |
| Built | SKYBOX DATA CENTER | Large load | — | 6.3 km away | nearest: Apple Campus 2 PV |
| Under construction | Maiden Creek Battery | Storage | 50 MW | 6.5 km away | nearest: Apple Data Center PV |
| Under construction | CLT40 DATA CENTER | Large load | — | 6.5 km away | nearest: Apple Data Center - PV2 |
| Filed | RED HAWK PH 3 (Mesa data centre) | Large load | — | 6.8 km away | nearest: Mesa Solar Array |
| Built | 4054 Digital Realty | Large load | — | 7.2 km away | nearest: Apple Campus 2 PV |
| Filed | Edgecore -3580 | Large load | — | 7.2 km away | nearest: Apple Campus 2 PV |
| Unknown | EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT | Large load | — | 7.2 km away | nearest: Apple Campus 2 PV |
| Under construction | Kifer BESS 1 | Storage | 50 MW | 7.3 km away | nearest: Apple Campus 2 PV |
| Filed | 888 Ross Data Center | Large load | — | 8.1 km away | nearest: Apple Campus 2 PV |
| Filed | LBA Data Center West | Large load | — | 8.8 km away | nearest: Apple Campus 2 PV |
| Filed | DC-N (San Jose data centre) | Large load | — | 9.9 km away | nearest: Apple Campus 2 PV |
| Filed | Data Center | Large load | — | 11.0 km away | nearest: Apple Campus 2 PV |
| Postponed | Austin Solar | Solar | 2 MW | 11.2 km away | nearest: Apple Data Center PV |
| Unknown | SJC02 & SJC03 DATA CENTER | Large load | — | 12.8 km away | nearest: Apple Campus 2 PV |
| Under construction | MICROSOFT PHX 16 DATA CENTER | Large load | — | 16.0 km away | nearest: Mesa Solar Array |
| Postponed | Tower Solar Center LLC | Solar | 5 MW | 17.8 km away | nearest: Apple Data Center - Fuel Cell 1&2 |
| Postponed | Waste Management Tri-Cities LFGTE | Biomass | 4.8 MW | 18.7 km away | nearest: Apple Campus 2 PV |
| Under construction | Fremont CA AutoFactory | Solar | 3.8 MW | 19.0 km away | nearest: Apple Campus 2 PV |
| Under construction | 7999 Gateway Solar | Solar | 4.6 MW | 21.5 km away | nearest: Apple Campus 2 PV |
| Unknown | CHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER | Large load | — | 22.7 km away | nearest: Apple Campus 2 PV |
| Filed | Equinix SV-19 - 131 Great Oaks Blvd SJ | Large load | — | 22.8 km away | nearest: Apple Campus 2 PV |
| Announced | Gateway#1&2 (Newark CA) | Solar | 1.1 MW | 23.9 km away | nearest: Apple Campus 2 PV |
| Postponed | Copper Crossing Energy and Research Cent | Gas, combustion turbine | 1,779 MW | 24.0 km away | nearest: Mesa Carport PV |
Sources EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA · EIA-860M · CAISO
Sources
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- CAISO Public Queue ReportSource: California ISO