Show on map
Mission - San Luis Rey 230 kV — Transmission lineEnerSmart Mesa Heights Sub Station — Under construction · Storage · CA · 3 MW · 0.6 mi awayL3 Harris San Diego — Under construction · Solar · CA · 1.6 MW · 1.3 mi awayCarlsbad Energy Center — Postponed · Gas, combustion turbine · CA · 105.5 MW · 1.4 mi awayRancho Penasquitos — Under construction · Hydro · CA · 4.3 MW · 3.2 mi awayEnterprise BESS — Permitted · Storage · CA · 54.1 MW · 5.5 mi awayAlvarado Hydro Facility — Postponed · Hydro · CA · 1.4 MW · 5.6 mi awayDon Lee BESS 1 LLC — Postponed · Storage · CA · 6.5 MW · 5.7 mi awayEnerSmart Murray BESS — Postponed · Storage · CA · 21 MW · 6.7 mi awayPomerado Energy Storage, LLC — Postponed · Storage · CA · 6 MW · 7.5 mi awayCA National City Terminal Ave — Under construction · Solar · CA · 1.1 MW · 9.0 mi awayEnerSmart El Cajon BESS — Postponed · Storage · CA · 3 MW · 12.4 mi awayEnerSmart Imperial Beach BESS — Postponed · Storage · CA · 6 MW · 14.0 mi away
  • Clean firm
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Mission - San Luis Rey 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-CA
Owner (as stated)
San Diego Gas Electric

Details

Who’s behind it

Owner
San Diego Gas Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
35
Substations at the ends (as the source names them)
Mission to San Luis Rey
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itsan diego gas electric
HIFLD line ID304397
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
EnerSmart Mesa Heights Sub Station Under construction Storage 0.6 mi 3
L3 Harris San Diego Under construction Solar 1.3 mi 1.6
Carlsbad Energy Center Postponed Gas, combustion turbine 1.4 mi 105.5
Rancho Penasquitos Under construction Hydro 3.2 mi 4.3
Enterprise BESS Permitted Storage 5.5 mi 54.1
Alvarado Hydro Facility Postponed Hydro 5.6 mi 1.4
Don Lee BESS 1 LLC Postponed Storage 5.7 mi 6.5
EnerSmart Murray BESS Postponed Storage 6.7 mi 21
Pomerado Energy Storage, LLC Postponed Storage 7.5 mi 6
CA National City Terminal Ave Under construction Solar 9.0 mi 1.1
EnerSmart El Cajon BESS Postponed Storage 12.4 mi 3
EnerSmart Imperial Beach BESS Postponed Storage 14.0 mi 6

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution