Show on map
Mistersky — Power plant · Gas, steam turbine · City of Detroit - (MI)East Windsor cogeneration centre 2 — Under construction · Gas, combustion turbine · Canada · 100 MW · 4.8 mi awayCity of Detroit Greenfield — Permitted · Solar · MI · 7 MW · 8.1 mi awayCity of Detroit Castle Solar — Under construction · Solar · MI · 10 MW · 8.3 mi awayTrenton Channel Energy Center — Under construction · Storage · MI · 220 MW · 13.3 mi away123NET — Built · Large load · MI · 13.8 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1950
Net generation, 2013
0 MWh
Location
Wayne County, Michigan

Output

Net generation MWh by year, 2001 to 2014
Fuel burned MMBtu by year, 2001 to 2014
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
76 years since 1950
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110002379426
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1005510
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
April 2014
First unit retired
April 2010
Capacity retired
189 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
5Natural Gas Steam Turbine44 MWRetiredApril 2010
6Natural Gas Steam Turbine50 MWRetiredApril 2014
7Natural Gas Steam Turbine60 MWRetiredApril 2014
GT1Petroleum Liquids35 MWRetiredApril 2014
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine154 MW
Petroleum Liquids35 MW

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
MISO
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
City of Detroit - (MI) Operator EIA-860M
Mistersky Power Station, City of Detroit Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units 6, 7, GT1 scheduled to retire, 145 MW · EIA-860M
  • Stated Unit 5 scheduled to retire, 44 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
East Windsor cogeneration centre 2 Under construction Gas, combustion turbine 4.8 mi 100
City of Detroit Greenfield Permitted Solar 8.1 mi 7
City of Detroit Castle Solar Under construction Solar 8.3 mi 10
Trenton Channel Energy Center Under construction Storage 13.3 mi 220
123NET Built Large load 13.8 mi

Sources GEM · EIA-860M · Berkeley Lab · EPA ICIS-Air

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026

Attribution