Show on map
North Bloomfield - Agawam 345 kV — Transmission lineDollar Tree Solar One — Postponed · Solar · CT · 2 MW · 1.5 mi awayBroadleaf Solar — Filed · Solar · CT · 200 MW · 1.6 mi awayWindsor Locks — Under construction · Solar · CT · 1.8 MW · 3.3 mi awayCT Airport Authority Solar One — Announced · Solar · CT · 4 MW · 4.1 mi awayHolyoke MA BESS 1 — Under construction · Storage · MA · 5 MW · 5.3 mi awayChicopee BESS — Under construction · Storage · MA · 5 MW · 5.8 mi awayPalmer Renewable Energy — Postponed · Biomass · MA · 42 MW · 6.0 mi awayHomestead Fuel Cell — Postponed · Gas, other · CT · 8.4 MW · 7.7 mi awayRiverside Holyoke — Postponed · Hydro · MA · 1.1 MW · 7.8 mi awayHadley Falls — Postponed · Hydro · MA · 3.5 MW · 8.5 mi awayHartford Hospital Cogeneration — Postponed · Gas, combustion turbine · CT · 11.5 MW · 9.6 mi awayStony Brook — Postponed · Gas, combined cycle · MA · 422 MW · 9.7 mi awayNU - WETHERSFIELD DATA CENTER — Built · Large load · CT · 12.4 mi awayEllington Solar One — Postponed · Solar · CT · 2 MW · 12.4 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

North Bloomfield - Agawam 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-CT, US-MA
Owner (as stated)
Connecticut Light Power

Details

Who’s behind it

Owner
Connecticut Light Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
18
Substations at the ends (as the source names them)
North Bloomfield to Agawam
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itconnecticut light power
HIFLD line ID157044
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Dollar Tree Solar One Postponed Solar 1.5 mi 2
Broadleaf Solar Filed Solar 1.6 mi 200
Windsor Locks Under construction Solar 3.3 mi 1.8
CT Airport Authority Solar One Announced Solar 4.1 mi 4
Holyoke MA BESS 1 Under construction Storage 5.3 mi 5
Chicopee BESS Under construction Storage 5.8 mi 5
Palmer Renewable Energy Postponed Biomass 6.0 mi 42
Homestead Fuel Cell Postponed Gas, other 7.7 mi 8.4
Riverside Holyoke Postponed Hydro 7.8 mi 1.1
Hadley Falls Postponed Hydro 8.5 mi 3.5
Hartford Hospital Cogeneration Postponed Gas, combustion turbine 9.6 mi 11.5
Stony Brook Postponed Gas, combined cycle 9.7 mi 422
NU - WETHERSFIELD DATA CENTER Built Large load 12.4 mi
Ellington Solar One Postponed Solar 12.4 mi 2

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution