Show on map
NUSTAR ENERGY LP, WILIMINGTON — Petroleum product terminalSan Pedro Public Market (SPPM) — Under construction · Solar · CA · 1.2 MW · 2.2 mi awayElevate Pier S — Filed · Storage · CA · 70 MW · 2.4 mi awayWatson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 4.0 mi awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 5.9 mi awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 6.1 mi awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 6.2 mi awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 6.2 mi awayTorrance Dis Ctr 2 - SLLAX100 — Under construction · Solar · CA · 1.4 MW · 6.5 mi awayCobalt — Under construction · Solar + storage · CA · 250 MW · 14.0 mi awayScattergood — Postponed · Gas, combined cycle · CA · 346 MW · 14.3 mi awayWestminster Reliability Project, LLC — Under construction · Storage · CA · 110 MW · 14.5 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Nustar Energy LP, Wilimington

Petroleum product terminal

As filed: NUSTAR ENERGY LP, WILIMINGTON

Key facts

Petroleum product terminal Operating
Location
California

Details

Who’s behind it

Owner
Nustar EnergySourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity not stated

All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Attributes
AttributeValue
Padd5
SiteWILIMINGTON
SurveyEIA-815
Owner, as the source states itNUSTAR ENERGY LP
Source release202109

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Sources

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
San Pedro Public Market (SPPM) Under construction Solar 2.2 mi 1.2
Elevate Pier S Filed Storage 2.4 mi 70
Watson Cogeneration Withdrawn Gas, combined cycle 4.0 mi 94.2
Dominguez - SLLAX512 Under construction Solar 5.9 mi 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 6.1 mi 1.2
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 6.2 mi 1.3
Fordyce - SLLAX680 Under construction Solar 6.2 mi 1.3
Torrance Dis Ctr 2 - SLLAX100 Under construction Solar 6.5 mi 1.4
Cobalt Under construction Solar + storage 14.0 mi 250
Scattergood Postponed Gas, combined cycle 14.3 mi 346
Westminster Reliability Project, LLC Under construction Storage 14.5 mi 110

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 16, 2026Source: California ISO

Attribution