Ocotillo — Power plant · Gas, combustion turbine · Arizona Public Service CoAMERICAN AIRLINES - PHX DATA CENTER BLDG 1920 — Large load · AZ · 5.2 km awayIron Mountain Data Center — Large load · AZ · 6.9 km awayPHOENIX DATA CENTER — Large load · AZ · 7.1 km awayStack Data Center — Large load · AZ · 8.9 km awayMCDOWELL ROAD DATA CENTER — Large load · AZ · 8.9 km awayQTS 40th Street — Large load · AZ · 9.1 km awayThistle Data Center Crane — Large load · AZ · 13.9 km awayCPUS WEST FRYE ROAD, LP — Large load · AZ · 14.0 km awayDIGITAL REALTY TRUST CHANDLER — Large load · AZ · 16.6 km awayCYRUSONE - CHANDLER — Large load · AZ · 16.6 km awayALIGNED PHX-04 DATA CENTER — Large load · AZ · 17.1 km awayPHX06 Data Center — Large load · AZ · 17.5 km awayRED HAWK PH 3 (Mesa data centre) — Large load · AZ · 23.3 km away11:11 Data Center — Large load · AZ · 23.3 km awayNTT PH 5 — Large load · AZ · 24.3 km away
  • Combustion
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 6% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1972
Net generation, 2025
443,322 MWh
Grid
69 kV to Arizona Public Service Co (AZPS)
Location
Maricopa County, Arizona

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
54 years since 1972
Unused energy
6,619 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,491 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Pinnacle West Capital Corp
Share pct
100
Gem entity id
E100000001283
Unit ids
G100000402433, G100000402434, G100000402435, G100000402436, G100000402437, G100000402438, G100000402439
Location id
L100000401710
Eia plant ids
116
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110009526539
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007299
Fuel burned (MMBtu), 20254,207,521
Capacity factor, 20250.063
Heat rate (Btu/kWh), 20259,490.9
Net generation (MWh), 2025443,322
Balancing authority codeAZPS

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
227.8 MW
Generators retired
5
Capacity still in service
806.2 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
PV1Solar Photovoltaic0.1 MWRetiredJuly 2015
PV2Solar Photovoltaic0.1 MWRetiredJuly 2015
PVMSolar Photovoltaic0.4 MWRetiredJuly 2015
1Natural Gas Steam Turbine113.6 MWRetiredJanuary 2019
2Natural Gas Steam Turbine113.6 MWRetiredJanuary 2019
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine227.2 MW
Solar Photovoltaic0.6 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
Arizona Public Service Co
Balancing authority
Arizona Public Service Company
NERC region
WECC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Arizona Public Service Co Operator EIA-860M
PINNACLE WEST CAPITAL CORP Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units 1, 2 scheduled to retire, 227.2 MW · EIA-860M
  • Stated Units PV1, PV2, PVM scheduled to retire, 0.6 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
AMERICAN AIRLINES - PHX DATA CENTER BLDG 1920 Under construction Large load 5.2 km
Iron Mountain Data Center Under construction Large load 6.9 km
PHOENIX DATA CENTER Built Large load 7.1 km
Stack Data Center Filed Large load 8.9 km
MCDOWELL ROAD DATA CENTER Built Large load 8.9 km
QTS 40th Street Filed Large load 9.1 km
Thistle Data Center Crane Filed Large load 13.9 km
CPUS WEST FRYE ROAD, LP Built Large load 14.0 km
DIGITAL REALTY TRUST CHANDLER Built Large load 16.6 km
CYRUSONE - CHANDLER Built Large load 16.6 km
ALIGNED PHX-04 DATA CENTER Under construction Large load 17.1 km
PHX06 Data Center Filed Large load 17.5 km
RED HAWK PH 3 (Mesa data centre) Filed Large load 23.3 km
11:11 Data Center Filed Large load 23.3 km
NTT PH 5 Filed Large load 24.3 km