P L Bartow — Power plant · Gas, combined cycle · Duke Energy Florida, LLCSouth Tampa Energy Storage — Postponed · Storage · FL · 20 MW · 5.4 mi awayH L Culbreath Bayside Power Station — Postponed · Gas, combustion turbine · FL · 503.8 MW · 11.4 mi awayTampa Electric Co NA 2 — Postponed · Gas, combustion turbine · FL · 982 MW · 11.4 mi awayBig Bend III Battery Storage — Permitted · Storage · FL · 75 MW · 12.9 mi awayTampa Electric Co NA 3 — Postponed · Gas, combustion turbine · FL · 99 MW · 13.1 mi away
  • Combustion
  • Storage
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 46% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1972
Net generation, 2025
5,981,174 MWh
Grid
230 kV to Duke Energy Florida, Inc (FPC)
Location
Pinellas County, Florida

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
54 years since 1972
Unused energy
6,945 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
7,666 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000588846
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001489
Fuel burned (MMBtu), 202545,854,567
Capacity factor, 20250.463
Heat rate (Btu/kWh), 20257,666.5
Net generation (MWh), 20255,981,174
Balancing authority codeFPC

Retirement

EIA-860M September 2026StatusSome generators are scheduled to retire; most of the plant's capacity is not, so it is shown as operating. As of EIA-860M for September 2026.
Capacity retired
494.3 MW
Generators retired
3
Next scheduled retirement
June 2034
Capacity scheduled to retire
221.6 MW
Generators scheduled to retire
4
Share of in-service capacity scheduled
15%
Capacity still in service
1,475.6 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
ST1Petroleum Liquids127.5 MWRetiredJune 2009
ST2Petroleum Liquids127.5 MWRetiredJune 2009
ST3Petroleum Liquids239.3 MWRetiredJune 2009
P1Petroleum Liquids55.4 MWScheduled to retireJune 2034
P2Natural Gas Fired Combustion Turbine55.4 MWScheduled to retireJune 2034
P3Petroleum Liquids55.4 MWScheduled to retireJune 2034
P4Natural Gas Fired Combustion Turbine55.4 MWScheduled to retireJune 2034
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Petroleum Liquids494.3 MW110.8 MW
Natural Gas Fired Combustion Turbine110.8 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV
Transmission or distribution system owner
Duke Energy Florida, Inc
Balancing authority
Progress Energy Florida
NERC region
SERC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Duke Energy Florida, LLC Operator EIA-860M
Duke Energy Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units P1, P2, P3, P4 scheduled to retire, 221.6 MW · EIA-860M
  • Stated Units ST1, ST2, ST3 scheduled to retire, 494.3 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
South Tampa Energy Storage Postponed Storage 5.4 mi 20
H L Culbreath Bayside Power Station Postponed Gas, combustion turbine 11.4 mi 503.8
Tampa Electric Co NA 2 Postponed Gas, combustion turbine 11.4 mi 982
Big Bend III Battery Storage Permitted Storage 12.9 mi 75
Tampa Electric Co NA 3 Postponed Gas, combustion turbine 13.1 mi 99

Sources EIA-860M