Show on map
Pacific Cruise Ship Terminals Berth 93 — Power plant · Solar · City of Los Angeles Harbor Department - (CA)San Pedro Public Market (SPPM) — Under construction · Solar · CA · 1.2 MW · 0.2 mi awayElevate Pier S — Filed · Storage · CA · 70 MW · 3.8 mi awayWatson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 6.1 mi awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 7.9 mi awayTorrance Dis Ctr 2 - SLLAX100 — Under construction · Solar · CA · 1.4 MW · 8.1 mi awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 8.2 mi awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 8.2 mi awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 8.2 mi awayCobalt — Under construction · Solar + storage · CA · 250 MW · 12.5 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Pacific Cruise Ship Terminals Berth 93

Power plant · Solar

Key facts

Power plant · Solar Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2010
Net generation, 2025
0 MWh
Grid
34 kV to Los Angeles Department of Water & Power (LDWP)
Location
Los Angeles County, California
Operated by
City of Los Angeles Harbor Department - (CA)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2010 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
16 years since 2010
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000838818
Location id
L100000833151
Eia plant ids
57309
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
34.50
Transmission owner
Los Angeles Department of Water & Power
Balancing authority code
LDWP
Balancing authority name
Los Angeles Department of Water and Power
Eia status
By code
OS
Mw
1
Units
1
Standby mw
0
Status rule
majority_mw_out_of_service
In service mw
1
Out of service mw
1
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeLDWP
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Solar array

Array area (acres)
2.4
AC capacity (MW)
1
DC capacity (MW)
1.1
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2010

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
San Pedro Public Market (SPPM) Under construction Solar 0.2 mi 1.2
Elevate Pier S Filed Storage 3.8 mi 70
Watson Cogeneration Withdrawn Gas, combined cycle 6.1 mi 94.2
Dominguez - SLLAX512 Under construction Solar 7.9 mi 1.3
Torrance Dis Ctr 2 - SLLAX100 Under construction Solar 8.1 mi 1.4
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 8.2 mi 1.2
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 8.2 mi 1.3
Fordyce - SLLAX680 Under construction Solar 8.2 mi 1.3
Cobalt Under construction Solar + storage 12.5 mi 250

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 18, 2026Source: California ISO

Attribution