Show on map
PFMG Solar Grossmont Helix LLC — Power plant · Solar · Altus Power America Management, LLCAlvarado Hydro Facility — Postponed · Hydro · CA · 1.4 MW · 2.0 mi awayEnerSmart Murray BESS — Postponed · Storage · CA · 21 MW · 2.6 mi awayEnerSmart El Cajon BESS — Postponed · Storage · CA · 3 MW · 7.3 mi awayL3 Harris San Diego — Under construction · Solar · CA · 1.6 MW · 7.5 mi awayEnerSmart Mesa Heights Sub Station — Under construction · Storage · CA · 3 MW · 8.3 mi awayCA National City Terminal Ave — Under construction · Solar · CA · 1.1 MW · 8.4 mi awayEnerSmart Imperial Beach BESS — Postponed · Storage · CA · 6 MW · 12.3 mi awayPomerado Energy Storage, LLC — Postponed · Storage · CA · 6 MW · 12.9 mi awayRancho Penasquitos — Under construction · Hydro · CA · 4.3 MW · 13.5 mi away
  • Clean firm
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

PFMG Solar Grossmont Helix LLC

Power plant · Solar

Key facts

Power plant · Solarran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
2,096 MWh
Grid
0.5 kV to San Diego Gas & Electric Co (CISO)
Location
San Diego County, California
Operated by
Altus Power America Management, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817264
Location id
L100000814479
Eia plant ids
62611
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
0.500
Transmission owner
San Diego Gas & Electric Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20257,149
Capacity factor, 20250.199
Net generation (MWh), 20252,096
Balancing authority codeCISO

Solar array

Array area (acres)
3.1
AC capacity (MW)
1.2
DC capacity (MW)
1.4
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Alvarado Hydro Facility Postponed Hydro 2.0 mi 1.4
EnerSmart Murray BESS Postponed Storage 2.6 mi 21
EnerSmart El Cajon BESS Postponed Storage 7.3 mi 3
L3 Harris San Diego Under construction Solar 7.5 mi 1.6
EnerSmart Mesa Heights Sub Station Under construction Storage 8.3 mi 3
CA National City Terminal Ave Under construction Solar 8.4 mi 1.1
EnerSmart Imperial Beach BESS Postponed Storage 12.3 mi 6
Pomerado Energy Storage, LLC Postponed Storage 12.9 mi 6
Rancho Penasquitos Under construction Hydro 13.5 mi 4.3

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution