Show on map
Pine Tree Solar Project — Power plant · Solar · Los Angeles Department of Water & PowerTehachapi Spindle — Storage · CA · 20 MW · 20.4 km awayAratina Solar Center 2 — Solar + storage · CA · 200 MW · 21.0 km away4001 and 2510 ClearVista Solar and Wind — Wind · CA · 24.5 MW · 22.6 km awayBolthouse Solar LLC — Solar · CA · 3 MW · 23.1 km awayWindhub Solar B, LLC — Solar · CA · 26.4 MW · 25.0 km away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Pine Tree Solar Project

Power plant · Solar

Key facts

Power plant · Solarran 10% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2025
7,420 MWh
Grid
34 kV to Los Angeles Department of Water & Power (LDWP)
Location
Kern County, California
Operated by
Los Angeles Department of Water & PowerSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2013 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
13 years since 2013
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817292
Location id
L100000814507
Eia plant ids
57306
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
34.50
Transmission owner
Los Angeles Department of Water & Power
Balancing authority code
LDWP
Balancing authority name
Los Angeles Department of Water and Power
Fuel burned (MMBtu), 202525,317
Capacity factor, 20250.100
Net generation (MWh), 20257,420
Balancing authority codeLDWP

Solar array

Array area (acres)
30.8
AC capacity (MW)
8.5
DC capacity (MW)
9.8
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2013

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Tehachapi Spindle Withdrawn Storage 20.4 km 20
Aratina Solar Center 2 Under construction Solar + storage 21.0 km 200
4001 and 2510 ClearVista Solar and Wind Withdrawn Wind 22.6 km 24.5
Bolthouse Solar LLC Postponed Solar 23.1 km 3
Windhub Solar B, LLC Under construction Solar 25.0 km 26.4

Sources CAISO · EIA-860M

Sources

Attribution