Tehachapi Spindle
Storage
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Queue position
- 522C, 925
- In-service date
- (stated)
- Location
- Kern County, California
Details
Who’s behind it
- Developer
- Beacon Power LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Flywheels”
- Connects at
- Kern River-Cummings 66kVConnection point0 MW active (0 of 2 projects).
- EIA plant
- 58291 generator TS1
At this site
2 records at Tehachapi SpindleAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Tehachapi Spindle this record | Storage | 20 | Withdrawn |
| Co-located, other technology high confidence | RE TEHACHAPI SOLAR 2 | Solar | 20 | Withdrawn |
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- CAISO Public Queue ReportSource: California ISO
Timeline
- Observed as withdrawn in CAISO.
- Stated In-service date stated by CAISO.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesSources
- CAISO Public Queue ReportSource: California ISO
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Windhub Solar B, LLC Under construction | Solar | 7.8 km | 26.4 |
| Sanborn Hybrid 3 Under construction | Solar + storage | 9.2 km | 1,400 |
| Aratina Solar Center 2 Under construction | Solar + storage | 9.9 km | 200 |
| Bellefield 2 Solar & Energy Storage Farm Under construction | Solar + storage | 11.9 km | 500 |
| Syracuse and Tours Renewable Energy Permitted | Solar + storage | 14.8 km | 80 |
| Willow Rock Energy Storage Center Contracted | Storage | 15.2 km | 500 |
| Tehachapi Wind Resource I Postponed | Wind | 17.8 km | 0.6 |
| Bellefield 3 Solar and Battery Storage Contracted | Solar + storage | 18.5 km | 150 |
| 4001 and 2510 ClearVista Solar and Wind Withdrawn | Wind | 19.2 km | 24.5 |
| Bolthouse Solar LLC Postponed | Solar | 23.4 km | 3 |
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- CAISO Public Queue ReportSource: California ISO