Show on map
Tehachapi SpindleWindhub Solar B, LLC — Solar · CA · 26.4 MW · 7.8 km awaySanborn Hybrid 3 — Solar + storage · CA · 1,400 MW · 9.2 km awayAratina Solar Center 2 — Solar + storage · CA · 200 MW · 9.9 km awayBellefield 2 Solar & Energy Storage Farm — Solar + storage · CA · 500 MW · 11.9 km awaySyracuse and Tours Renewable Energy — Solar + storage · CA · 80 MW · 14.8 km awayWillow Rock Energy Storage Center — Storage · CA · 500 MW · 15.2 km awayTehachapi Wind Resource I — Wind · CA · 0.6 MW · 17.8 km awayBellefield 3 Solar and Battery Storage — Solar + storage · CA · 150 MW · 18.5 km away4001 and 2510 ClearVista Solar and Wind — Wind · CA · 24.5 MW · 19.2 km awayBolthouse Solar LLC — Solar · CA · 3 MW · 23.4 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Tehachapi Spindle

Storage

Capacity
Capacity: sourceCAISO · Open license, with creditMW
In-service date
(stated)
Location
Kern County, California

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Storage source: “Flywheels”
Connects at
Kern River-Cummings 66kVConnection point0 MW active (0 of 2 projects).
EIA plant
58291 generator TS1

At this site

2 records at Tehachapi SpindleAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Tehachapi Spindle this record Storage 20 Withdrawn
Co-located, other technology high confidence RE TEHACHAPI SOLAR 2 Solar 20 Withdrawn

Sources EIA-860M · CAISO

Sources

Attribution

Timeline

  • Observed as withdrawn in CAISO.
  • Stated In-service date stated by CAISO.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources CAISO · EIA-860M

Sources

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Windhub Solar B, LLC Under construction Solar 7.8 km 26.4
Sanborn Hybrid 3 Under construction Solar + storage 9.2 km 1,400
Aratina Solar Center 2 Under construction Solar + storage 9.9 km 200
Bellefield 2 Solar & Energy Storage Farm Under construction Solar + storage 11.9 km 500
Syracuse and Tours Renewable Energy Permitted Solar + storage 14.8 km 80
Willow Rock Energy Storage Center Contracted Storage 15.2 km 500
Tehachapi Wind Resource I Postponed Wind 17.8 km 0.6
Bellefield 3 Solar and Battery Storage Contracted Solar + storage 18.5 km 150
4001 and 2510 ClearVista Solar and Wind Withdrawn Wind 19.2 km 24.5
Bolthouse Solar LLC Postponed Solar 23.4 km 3

Sources EIA-860M · CAISO

Sources

Attribution