Pirkey: location and 2 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Pirkey
Power plant · Coal
Key facts
Power plant · Coalran 47% of 2022 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1985
- Net generation, 2022
- 2,957,777 MWh
- Grid
- 138 kV to Southwestern Electric Power Co (SWPP)
- Location
- Harrison County, Texas
- Operated by
- Southwestern Electric Power Co
Output
- Gas
- Coal
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Coal source: “Conventional Steam Coal”
- Age
- 41 years since 1985
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | SWPP |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- March 2023
- Capacity retired
- 721 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Conventional Steam Coal | 721 MW | Retired | March 2023 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 138 kV
- Transmission or distribution system owner
- Southwestern Electric Power Co
- Balancing authority
- Southwest Power Pool
- NERC region
- MRO
Transmission lines within 25 km (10)
- 138 kV line (OSM way 585555220)
- 138 kV line (OSM way 585555221)
- Southwestern Electric Power Company 138 kV line (OSM way 343430371)
- Southwestern Electric Power Company 138 kV line (OSM way 290255005)
- Southwestern Electric Power Company 138 kV line (OSM way 290255027)
- Southwestern Electric Power Company 138 kV line (OSM way 290254821)
- Southwestern Electric Power Company 138 kV line (OSM way 1551423178)
- 345 kV line (OSM way 172367688)
- 345 kV line (OSM way 172601855)
- 345 kV line (OSM way 172601812)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
5 companies7| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Oklahoma Municipal Power Authority | Owner | 2.3% | 31 Dec 2025 | EIA-860 |
| Southwestern Electric Power Co | Owner | 85.9% | 31 Dec 2025 | EIA-860 |
| Northeast Texas Elec Coop, Inc | Owner | 11.7% | 31 Dec 2025 | EIA-860 |
| AMERICAN ELECTRIC POWER CO INC | Owner | 85.9% | 31 Dec 2023 | EPA GHGRP |
| Oklahoma Municipal Power Authority | Owner | 2.3% | 31 Dec 2023 | EPA GHGRP |
| NORTHEAST TEXAS ELECTRIC COOPERATIVE INC | Owner | 11.7% | 31 Dec 2023 | EPA GHGRP |
| Southwestern Electric Power Co | Operator | EIA-860M |
Timeline
- Stated Unit 1 scheduled to retire, 721 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · OpenStreetMap · EIA · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
© OpenStreetMap contributors
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Hallsville Announced | Gas, combustion turbine | 0.0 km | 450 |
| Martin Lake Postponed | Coal | 23.7 km | 800 |