Project #1 - Lockwood Regional LF
RNG project · Landfill gas to electricity
Key facts
RNG project · Landfill gas to electricity Operating- Location
- Storey County, Nevada
- Operated by
- WM Nevada Renewable Energy LLCSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Project type
- Reciprocating Engine
- Technology
- Landfill gas to electricity
- Rated capacity
- 3.2 MW
- LFG flow to project
- 1.21 MMscf/d
- Host landfill
- Lockwood Regional LF
- Start year
- 2012
Capacity not stated
All 11 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
| Attribute | Value |
|---|---|
| Landfills | 1 |
| Actual generation (MW) | 2.31 |
| Landfill opened | 1969 |
| Landfill closure year | 2140 |
| Waste in place (tons) | 47,296,688 |
| Waste in place, year | 2022 |
| Landfill design capacity (tons) | 346,203,240 |
| Landfill gas collected (MMscf/d) | 3.90 |
| Landfill gas generated (MMscf/d) | 8.54 |
| Direct emission reductions (MMTCO2e/yr) | 0.117 |
| Avoided emissions (MMTCO2e/yr) | 0.011 |
Timeline
- In service · EPA LMOP
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| BZI Crane (BTS 107) (Sparks data centre) Filed | Large load | 6.7 mi | |
| Peru Ridge - Data Center Building 1 Filed | Large load | 6.8 mi | |
| Maxim Crane 6257 Edgecore RN01 Sparks Filed | Large load | 7.4 mi | |
| Tesla Reno GigaFactory × 2 units Under construction | Solar | 9.9 mi | 11.4 |
Sources FAA OE/AAA · EIA-860M