Show on map
Project #1 - Lockwood Regional LF — RNG project · Landfill gas to electricity · WM Nevada Renewable Energy LLCBZI Crane (BTS 107) (Sparks data centre) — Filed · Large load · NV · 6.7 mi awayPeru Ridge - Data Center Building 1 — Filed · Large load · NV · 6.8 mi awayMaxim Crane 6257 Edgecore RN01 Sparks — Filed · Large load · NV · 7.4 mi awayTesla Reno GigaFactory — Under construction · Solar · NV · 1 MW · 9.9 mi awayTesla Reno GigaFactory — Postponed · Solar · NV · 10.4 MW · 9.9 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1 - Lockwood Regional LF

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Operating
Location
Storey County, Nevada
Operated by
WM Nevada Renewable Energy LLCSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Reciprocating Engine
Technology
Landfill gas to electricity
Rated capacity
3.2 MW
LFG flow to project
1.21 MMscf/d
Host landfill
Lockwood Regional LF
Start year
2012

Capacity not stated

All 11 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Actual generation (MW)2.31
Landfill opened1969
Landfill closure year2140
Waste in place (tons)47,296,688
Waste in place, year2022
Landfill design capacity (tons)346,203,240
Landfill gas collected (MMscf/d)3.90
Landfill gas generated (MMscf/d)8.54
Direct emission reductions (MMTCO2e/yr)0.117
Avoided emissions (MMTCO2e/yr)0.011

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
BZI Crane (BTS 107) (Sparks data centre) Filed Large load 6.7 mi
Peru Ridge - Data Center Building 1 Filed Large load 6.8 mi
Maxim Crane 6257 Edgecore RN01 Sparks Filed Large load 7.4 mi
Tesla Reno GigaFactory × 2 units Under construction Solar 9.9 mi 11.4

Sources FAA OE/AAA · EIA-860M

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution