Show on map
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
- Operating
RE Astoria: location and 10 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
RE Astoria
Power plant · Solar
Key facts
Power plant · Solarran 20% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2016
- Net generation, 2025
- 178,461 MWh
- Grid
- 220 kV to Southern California Edison Co (CISO)
- Location
- Kern County, California
- Operated by
- RE Astoria LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 10 years since 2016
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 608,909 |
| Capacity factor, 2025 | 0.204 |
| Net generation (MWh), 2025 | 178,461 |
| Balancing authority code | CISO |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 409.1
- AC capacity (MW)
- 100
- DC capacity (MW)
- 130.8
- Mounting
- Single-axis tracking
- Site type
- Greenfield
- Began operating
- 2016
Timeline
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Solar Star 3 Under construction | Solar + storage | 0.3 mi | 24 |
| Solar Star 4 Under construction | Solar + storage | 0.3 mi | 24 |
| Rosamond South II Under construction | Storage | 1.6 mi | 140 |
| Alpine Solar Withdrawn | Solar | 4.6 mi | 66 |
| Gaskell West Storage 1, LLC Under construction | Storage | 5.1 mi | 21.6 |
| Camino Solar Hybrid Postponed | Storage | 6.0 mi | 11 |
| Neenach Solar Center Postponed | Solar | 8.4 mi | 1.5 |
| Syracuse and Tours Renewable Energy Permitted | Solar + storage | 11.3 mi | 80 |
| Antelope Solar Farm Postponed | Solar | 12.1 mi | 20 |
| Portal Ridge Solar A, LLC Postponed | Solar | 14.4 mi | 19 |