Show on map
Red Wing — Power plant · Waste to energy · Northern States Power Co - Minnesota
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Waste to energy

Key facts

Power plant · Waste to energyran 62% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1949
Net generation, 2025
125,450 MWh
Grid
14 kV to Northern States Power Co - Minnesota (MISO)
Location
Goodhue County, Minnesota

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Waste to energy source: “Municipal Solid Waste”
Age
77 years since 1949
Heat rate
20,046 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Xcel Energy Inc
Share pct
100
Gem entity id
E100000001329
Unit ids
G100001055447, G100001055448
Location id
L100001048306
Eia plant ids
1926
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071160520
Subparts reported
C
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006774
Fuel burned (MMBtu), 20252,514,795
Capacity factor, 20250.623
Heat rate (Btu/kWh), 202520,046.2
Net generation (MWh), 2025125,450
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
December 2037
Capacity scheduled to retire
23 MW
Generators scheduled to retire
2
Share of in-service capacity scheduled
100%
Capacity still in service
23 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Municipal Solid Waste11.5 MWScheduled to retireDecember 2037
2Municipal Solid Waste11.5 MWScheduled to retireDecember 2037

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
14 kV
Transmission or distribution system owner
Northern States Power Co - Minnesota
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Transmission lines within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Northern States Power Co - Minnesota Operator EIA-860M
Xcel Energy Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units 1, 2 scheduled to retire, 23 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source