Riverbay: location and 31 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Riverbay
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 23% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2011
- Net generation, 2025
- 88,293 MWh
- Grid
- 26 kV to Consolidated Edison Co-NY Inc (NYIS)
- Location
- Bronx County, New York
- Operated by
- Riverbay Corp
Output
- Gas
- Oil
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 15 years since 2011
- Unused energy
- 293 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 26,689 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 2,356,492 |
| Capacity factor, 2025 | 0.232 |
| Heat rate (Btu/kWh), 2025 | 26,689.4 |
| Net generation (MWh), 2025 | 88,293.3 |
| Balancing authority code | NYIS |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 6 MW
- Generators retired
- 1
- Capacity still in service
- 43.5 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN1 | Petroleum Liquids | 6 MW | Retired | October 2006 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 26 kV
- Transmission or distribution system owner
- Consolidated Edison Co-NY Inc
- Balancing authority
- New York Independent System Operator
- NERC region
- NPCC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Riverbay Corp | Operator | EIA-860M | ||
| RIVERBAY CORP-CO-OP CITY | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- In service · EIA-860M
- Stated Unit GEN1 scheduled to retire, 6 MW · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Eastern BlueBird Clean Energy LLC Under construction | Storage | 1.1 mi | 4.4 |
| Northern Cardinal Clean Energy, LLC Under construction | Storage | 1.1 mi | 4.4 |
| Lobelia 4452 Clean Energy LLC Under construction | Storage | 3.9 mi | 4.9 |
| Lobelia Clean Energy LLC Under construction | Storage | 3.9 mi | 4.9 |
| Piping Plover Clean Energy, LLC Under construction | Storage | 4.2 mi | 2.3 |
| Warbler Clean Energy LLC Under construction | Storage | 4.2 mi | 2.3 |
| Wintergreen Clean Energy, LLC Under construction | Storage | 5.2 mi | 4.9 |
| Wintergreen C Clean Energy LLC Under construction | Storage | 5.2 mi | 4.9 |
| Wintergreen B Clean Energy LLC Under construction | Storage | 5.2 mi | 4.9 |
| Wintergreen D Clean Energy LLC Under construction | Storage | 5.2 mi | 4.9 |
| Lincoln Medical and Mental Health Center Under construction | Oil | 6.4 mi | 1 |
| Astoria Gas Turbines Postponed | Gas, combustion turbine | 7.1 mi | 431 |
| New York University Central Plant Under construction | Gas, combined cycle | 7.6 mi | 5.5 |
| Ravenswood Postponed | Storage | 10.0 mi | 316 |
| Roseate Tern Clean Energy LLC Under construction | Storage | 11.2 mi | 3.3 |
| Water Willow A Clean Energy LLC Under construction | Storage | 11.4 mi | 3.9 |
| Water Willow B Clean Energy LLC Under construction | Storage | 11.4 mi | 3.9 |
| CYXTERA - NJ2X Built | Large load | 13.0 mi | |
| Linden Clean Energy, LLC Under construction | Storage | 13.2 mi | 3.7 |
| Coral Honeysuckle Clean Energy LLC Under construction | Storage | 13.2 mi | 3.7 |
| NISA Electric Generation Project × 2 units Permitted | Storage | 13.6 mi | 392.5 |
| DATA CENTER BUILDING EXPANSION Under construction | Large load | 13.8 mi | |
| Blue Aster B Clean Energy LLC Under construction | Storage | 14.1 mi | 4.9 |
| Blue Aster Clean Energy LLC Under construction | Storage | 14.1 mi | 4.9 |
| Blue Aster C Clean Energy LLC Under construction | Storage | 14.1 mi | 4.9 |
| EQUINIX Built | Large load | 14.2 mi | |
| CDIL DATA CENTRE USA LLC Built | Large load | 14.3 mi | |
| CORESITE NY4 DATA CENTER Under construction | Large load | 14.3 mi | |
| EQUINIX LLC Built | Large load | 14.4 mi | |
| ORANGETOWN DATA CENTER Built | Large load | 14.7 mi |