Show on map
- Combustion
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Other infrastructure
San Bernardino 230 kV line: route and 30 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
San Bernardino 230 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-CA
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 23
- Substations at the ends (as the source names them)
- San Bernardino
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 310697 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Solar Photovoltaic Project #04 Postponed | Solar | 0.2 mi | 1.5 |
| Solar Photovoltaic Project #23 Postponed | Solar | 0.2 mi | 0.5 |
| SunE Redlands Postponed | Solar | 0.3 mi | 1.5 |
| Solar Photovoltaic Project #10 Postponed | Solar | 0.4 mi | 0.5 |
| Solar Photovoltaic Project #19 Postponed | Solar | 0.4 mi | 5 |
| Solar Photovoltaic Project #18 Postponed | Solar | 0.4 mi | 0.5 |
| Solar Photovoltaic Project #14 Postponed | Solar | 0.5 mi | 1.5 |
| CA Bloomington 2551 S Lilac Avenue Micro Under construction | Solar + storage | 0.5 mi | 3 |
| Solar Photovoltaic Project #24 Postponed | Solar | 0.7 mi | 4 |
| Solar Photovoltaic Project #17 Postponed | Solar | 0.9 mi | 0.5 |
| Solar Photovoltaic Project #30 Postponed | Solar | 1.2 mi | 1.5 |
| Solar Photovoltaic Project #21 Postponed | Solar | 1.8 mi | 2.5 |
| Redlands DC 9 - sline609 Under construction | Solar + storage | 2.0 mi | 5 |
| Solar Photovoltaic Project #20 Postponed | Solar | 2.1 mi | 3.5 |
| Solar Photovoltaic Project #31 Postponed | Solar | 2.2 mi | 1 |
| Solar Photovoltaic Project #28 Postponed | Solar | 2.3 mi | 0.5 |
| CA Riverside 2356 Fleetwood Dr. Under construction | Solar + storage | 2.3 mi | 4 |
| Solar Photovoltaic Project #12 Postponed | Solar | 2.6 mi | 0.5 |
| Solar Photovoltaic Project #08 Postponed | Solar | 2.8 mi | 0.5 |
| Solar Photovoltaic Project #09 Postponed | Solar | 3.2 mi | 0.5 |
| Roadhouse Energy Center Contracted | Storage | 4.1 mi | 300 |
| Energy Center Announced | Gas, combustion turbine | 4.3 mi | 0.9 |
| Solar Photovoltaic Project #25 Postponed | Solar | 5.7 mi | 4.5 |
| Solar Photovoltaic Project #27 Postponed | Solar | 5.8 mi | 1 |
| RCWMD Badlands Landfill Gas Project Postponed | Biomass | 8.3 mi | 1.2 |
| OES Biogas Power Under construction | Biomass | 8.6 mi | 2.6 |
| Amazon - Moreno Valley Postponed | Solar | 11.0 mi | 2.2 |
| Perris DC 5 - sline015 Under construction | Solar | 12.5 mi | 1.6 |
| Lake Perris Solar Postponed | Solar | 14.9 mi | 1.5 |
| San Jacinto Solar Postponed | Solar | 15.0 mi | 1.5 |