Show on map
- Combustion
- Wind & solar
- Bioenergy
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Bioenergy
- In development
- Under construction
- Other infrastructure
San Bernardino - El Casco 230 kV: route and 17 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
San Bernardino - El Casco 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-CA
- Owner (as stated)
- Azusa Light Power
Details
Who’s behind it
- Owner
- Azusa Light Power
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 14
- Substations at the ends (as the source names them)
- San Bernardino to El Casco
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | azusa light power |
| HIFLD line ID | 306517 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| SunE Redlands Postponed | Solar | 0.3 mi | 1.5 |
| RCWMD Badlands Landfill Gas Project Postponed | Biomass | 1.3 mi | 1.2 |
| Redlands DC 9 - sline609 Under construction | Solar + storage | 2.0 mi | 5 |
| Solar Photovoltaic Project #20 Postponed | Solar | 2.1 mi | 3.5 |
| Solar Photovoltaic Project #28 Postponed | Solar | 2.3 mi | 0.5 |
| Energy Center Announced | Gas, combustion turbine | 4.0 mi | 0.9 |
| Solar Photovoltaic Project #24 Postponed | Solar | 7.7 mi | 4 |
| CA Bloomington 2551 S Lilac Avenue Micro Under construction | Solar + storage | 7.9 mi | 3 |
| CA Riverside 2356 Fleetwood Dr. Under construction | Solar + storage | 8.2 mi | 4 |
| OES Biogas Power Under construction | Biomass | 8.9 mi | 2.6 |
| Lake Perris Solar Postponed | Solar | 9.2 mi | 1.5 |
| San Jacinto Solar Postponed | Solar | 9.4 mi | 1.5 |
| Amazon - Moreno Valley Postponed | Solar | 9.4 mi | 2.2 |
| Perris DC 5 - sline015 Under construction | Solar | 10.5 mi | 1.6 |
| Solar Photovoltaic Project #30 Postponed | Solar | 10.7 mi | 1.5 |
| Solar Photovoltaic Project #25 Postponed | Solar | 11.1 mi | 4.5 |
| Solar Photovoltaic Project #27 Postponed | Solar | 11.1 mi | 1 |
Sources EIA-860M