Show on map
San Bernardino - El Casco 230 kV — Transmission lineSunE Redlands — Postponed · Solar · CA · 1.5 MW · 0.3 mi awayRCWMD Badlands Landfill Gas Project — Postponed · Biomass · CA · 1.2 MW · 1.3 mi awayRedlands DC 9 - sline609 — Under construction · Solar + storage · CA · 5 MW · 2.0 mi awaySolar Photovoltaic Project #20 — Postponed · Solar · CA · 3.5 MW · 2.1 mi awaySolar Photovoltaic Project #28 — Postponed · Solar · CA · 0.5 MW · 2.3 mi awayEnergy Center — Announced · Gas, combustion turbine · CA · 0.9 MW · 4.0 mi awaySolar Photovoltaic Project #24 — Postponed · Solar · CA · 4 MW · 7.7 mi awayCA Bloomington 2551 S Lilac Avenue Micro — Under construction · Solar + storage · CA · 3 MW · 7.9 mi awayCA Riverside 2356 Fleetwood Dr. — Under construction · Solar + storage · CA · 4 MW · 8.2 mi awayOES Biogas Power — Under construction · Biomass · CA · 2.6 MW · 8.9 mi awayLake Perris Solar — Postponed · Solar · CA · 1.5 MW · 9.2 mi awaySan Jacinto Solar — Postponed · Solar · CA · 1.5 MW · 9.4 mi awayAmazon - Moreno Valley — Postponed · Solar · CA · 2.2 MW · 9.4 mi awayPerris DC 5 - sline015 — Under construction · Solar · CA · 1.6 MW · 10.5 mi awaySolar Photovoltaic Project #30 — Postponed · Solar · CA · 1.5 MW · 10.7 mi awaySolar Photovoltaic Project #25 — Postponed · Solar · CA · 4.5 MW · 11.1 mi awaySolar Photovoltaic Project #27 — Postponed · Solar · CA · 1 MW · 11.1 mi away
  • Combustion
  • Wind & solar
  • Bioenergy
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

San Bernardino - El Casco 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-CA
Owner (as stated)
Azusa Light Power

Details

Who’s behind it

Owner
Azusa Light Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
14
Substations at the ends (as the source names them)
San Bernardino to El Casco
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itazusa light power
HIFLD line ID306517
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SunE Redlands Postponed Solar 0.3 mi 1.5
RCWMD Badlands Landfill Gas Project Postponed Biomass 1.3 mi 1.2
Redlands DC 9 - sline609 Under construction Solar + storage 2.0 mi 5
Solar Photovoltaic Project #20 Postponed Solar 2.1 mi 3.5
Solar Photovoltaic Project #28 Postponed Solar 2.3 mi 0.5
Energy Center Announced Gas, combustion turbine 4.0 mi 0.9
Solar Photovoltaic Project #24 Postponed Solar 7.7 mi 4
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 7.9 mi 3
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 8.2 mi 4
OES Biogas Power Under construction Biomass 8.9 mi 2.6
Lake Perris Solar Postponed Solar 9.2 mi 1.5
San Jacinto Solar Postponed Solar 9.4 mi 1.5
Amazon - Moreno Valley Postponed Solar 9.4 mi 2.2
Perris DC 5 - sline015 Under construction Solar 10.5 mi 1.6
Solar Photovoltaic Project #30 Postponed Solar 10.7 mi 1.5
Solar Photovoltaic Project #25 Postponed Solar 11.1 mi 4.5
Solar Photovoltaic Project #27 Postponed Solar 11.1 mi 1

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution