Show on map
- Clean firm
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Clean firm
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
San Diego Gas & Elec Co: route and 14 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
San Diego Gas & Elec Co
Gas pipeline · intrastate
Key facts
Gas pipeline · intrastate Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- Class
- intrastate
- States crossed
- US-CA
- Operated by
- San Diego Gas & Elec CoSourceEIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Pipeline class
- intrastate
- Mapped route length (miles)
- 131Two lengthsMapped route length is this pipeline’s route as mapped (EIA Energy Atlas); onshore transmission miles under Attributes is what the operator reported to PHMSA for 2025 for its whole onshore gas transmission system, so the two need not agree.
- Technology
- Intrastate source: “Intrastate”
- Units
- 3
All 5 attributes from EIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)
| Attribute | Value |
|---|---|
| PHMSA operator annual report |
|
| Mapped parts | 2 |
| Status, as the source states it | Operating |
| Mapped segments | 3 |
| Source release | 202001 |
Data notes (1)
- Significant incidents, last 5 years not shown: PHMSA's significant flag is published in PHMSA_Pipeline_Safety_Flagged_Incidents.zip, which could not be retrieved; the public incident file carries neither the flag nor the 1984-dollar cost its definition uses
Sources
2 sourcesAround this pipeline
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| L3 Harris San Diego Under construction | Solar | 0.3 mi | 1.6 |
| Rancho Penasquitos Under construction | Hydro | 0.6 mi | 4.3 |
| EnerSmart Murray BESS Postponed | Storage | 0.6 mi | 21 |
| EnerSmart Mesa Heights Sub Station Under construction | Storage | 1.3 mi | 3 |
| Alvarado Hydro Facility Postponed | Hydro | 1.4 mi | 1.4 |
| Carlsbad Energy Center Postponed | Gas, combustion turbine | 3.8 mi | 105.5 |
| Enterprise BESS Permitted | Storage | 3.9 mi | 54.1 |
| Don Lee BESS 1 LLC Postponed | Storage | 4.0 mi | 6.5 |
| Pomerado Energy Storage, LLC Postponed | Storage | 4.3 mi | 6 |
| EnerSmart El Cajon BESS Postponed | Storage | 4.6 mi | 3 |
| CA National City Terminal Ave Under construction | Solar | 5.3 mi | 1.1 |
| EnerSmart Imperial Beach BESS Postponed | Storage | 6.5 mi | 6 |
| Wildomar Solar Postponed | Solar | 12.9 mi | 1.2 |
| Chiquito Grid, LLC Postponed | Storage | 12.9 mi | 80 |
Sources EIA-860M