Scattergood: location and 10 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Scattergood
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 22% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1958
- Net generation, 2025
- 1,664,827 MWh
- Grid
- 230 kV, 138 kV to Los Angeles Department of Water & Power (LDWP)
- Location
- Los Angeles County, California
- Operated by
- Los Angeles Department of Water & Power
Output
- Gas
- Biomass and waste
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 68 years since 1958
- Unused energy
- 6,009 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 7,752 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 12,905,047 |
| Capacity factor, 2025 | 0.217 |
| Heat rate (Btu/kWh), 2025 | 7,751.6 |
| Net generation (MWh), 2025 | 1,664,827 |
| Balancing authority code | LDWP |
Retirement
EIA-860M September 2026StatusSome generators are scheduled to retire; most of the plant's capacity is not, so it is shown as operating. As of EIA-860M for September 2026.- Capacity retired
- 496.8 MW
- Generators retired
- 1
- Next scheduled retirement
- December 2029
- Capacity scheduled to retire
- 326.4 MW
- Generators scheduled to retire
- 2
- Share of in-service capacity scheduled
- 37%
- Capacity still in service
- 876 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 3 | Natural Gas Steam Turbine | 496.8 MW | Retired | December 2015 |
| 1 | Natural Gas Steam Turbine | 163.2 MW | Scheduled to retire | December 2029 |
| 2 | Natural Gas Steam Turbine | 163.2 MW | Scheduled to retire | December 2029 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 230 kV, 138 kV
- Transmission or distribution system owner
- Los Angeles Department of Water & Power
- Balancing authority
- Los Angeles Department of Water and Power
- NERC region
- WECC
Transmission lines within 25 km (10)
Connection points within 25 km (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Los Angeles Department of Water & Power | Operator | EIA-860M | ||
| CITY OF LOS ANGELES CALIFORNIA | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Units 1, 2 scheduled to retire, 326.4 MW · EIA-860M
- Stated Unit 3 scheduled to retire, 496.8 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISO Public Queue ReportSource: California ISO
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Scattergood Postponed | Gas, combined cycle | 0.0 km | 346 |
| Torrance Dis Ctr 2 - SLLAX100 Under construction | Solar | 13.1 km | 1.4 |
| LATTC South Campus Solar Postponed | Solar | 19.4 km | 1.1 |
| Dominguez - SLLAX512 Under construction | Solar | 20.3 km | 1.3 |
| Watson Cogeneration Withdrawn | Gas, combined cycle | 20.3 km | 94.2 |
| PRIME DATA CENTER VERNON Built | Large load | 20.4 km | |
| South Bay Dis Ctr 6-SLLAX680 Under construction | Solar | 20.5 km | 1.3 |
| Fordyce - SLLAX680 Under construction | Solar | 20.5 km | 1.3 |
| South Bay Dis Ctr 12 - SLLAX104 Under construction | Solar | 20.5 km | 1.2 |
| San Pedro Public Market (SPPM) Under construction | Solar | 24.9 km | 1.2 |