Show on map
Solar Star 2 — Power plant · Solar · Solar Star California XX, LLCRosamond South II — Under construction · Storage · CA · 140 MW · 4.5 mi awaySolar Star 3 — Under construction · Solar + storage · CA · 24 MW · 5.8 mi awaySolar Star 4 — Under construction · Solar + storage · CA · 24 MW · 5.8 mi awaySyracuse and Tours Renewable Energy — Permitted · Solar + storage · CA · 80 MW · 7.5 mi awayCamino Solar Hybrid — Postponed · Storage · CA · 11 MW · 7.6 mi awayAlpine Solar — Withdrawn · Solar · CA · 66 MW · 9.5 mi awayAntelope Solar Farm — Postponed · Solar · CA · 20 MW · 10.0 mi awayPortal Ridge Solar A, LLC — Postponed · Solar · CA · 19 MW · 10.6 mi awayGaskell West Storage 1, LLC — Under construction · Storage · CA · 21.6 MW · 11.1 mi awayWillow Rock Energy Storage Center — Contracted · Storage · CA · 500 MW · 11.9 mi awayWindhub Solar B, LLC — Under construction · Solar · CA · 26.4 MW · 12.3 mi awayNeenach Solar Center — Postponed · Solar · CA · 1.5 MW · 14.3 mi awayTehachapi Wind Resource I — Postponed · Wind · CA · 0.6 MW · 14.8 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Solar Star 2

Power plant · Solar

Key facts

Power plant · Solarran 29% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2014
Net generation, 2025
720,719 MWh
Grid
230 kV to Southern California Edison Co (CISO)
Location
Kern County, California
Operated by
Solar Star California XX, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2014 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
12 years since 2014
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000804854, G100000804855, G100000804856, G100000804857, G100000804858, G100000810777
Location id
L100000804242
Eia plant ids
58389
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
230
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20252,459,093
Capacity factor, 20250.295
Net generation (MWh), 2025720,719
Balancing authority codeCISO

Solar arrays

Array area (acres)
1,316.1
AC capacity (MW)
279.5
DC capacity (MW)
349.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2015

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Rosamond South II Under construction Storage 4.5 mi 140
Solar Star 3 Under construction Solar + storage 5.8 mi 24
Solar Star 4 Under construction Solar + storage 5.8 mi 24
Syracuse and Tours Renewable Energy Permitted Solar + storage 7.5 mi 80
Camino Solar Hybrid Postponed Storage 7.6 mi 11
Alpine Solar Withdrawn Solar 9.5 mi 66
Antelope Solar Farm Postponed Solar 10.0 mi 20
Portal Ridge Solar A, LLC Postponed Solar 10.6 mi 19
Gaskell West Storage 1, LLC Under construction Storage 11.1 mi 21.6
Willow Rock Energy Storage Center Contracted Storage 11.9 mi 500
Windhub Solar B, LLC Under construction Solar 12.3 mi 26.4
Neenach Solar Center Postponed Solar 14.3 mi 1.5
Tehachapi Wind Resource I Postponed Wind 14.8 mi 0.6

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO

Attribution