Show on map
Solar Star California, XLI, LLC — Power plant · Solar · MN8 Energy LLCRosamond South II — Under construction · Storage · CA · 140 MW · 2.7 mi awaySolar Star 3 — Under construction · Solar + storage · CA · 24 MW · 3.9 mi awaySolar Star 4 — Under construction · Solar + storage · CA · 24 MW · 3.9 mi awayCamino Solar Hybrid — Postponed · Storage · CA · 11 MW · 7.1 mi awayAlpine Solar — Withdrawn · Solar · CA · 66 MW · 7.5 mi awaySyracuse and Tours Renewable Energy — Permitted · Solar + storage · CA · 80 MW · 8.9 mi awayGaskell West Storage 1, LLC — Under construction · Storage · CA · 21.6 MW · 9.1 mi awayAntelope Solar Farm — Postponed · Solar · CA · 20 MW · 9.8 mi awayPortal Ridge Solar A, LLC — Postponed · Solar · CA · 19 MW · 11.2 mi awayNeenach Solar Center — Postponed · Solar · CA · 1.5 MW · 12.3 mi awayWindhub Solar B, LLC — Under construction · Solar · CA · 26.4 MW · 13.7 mi awayWillow Rock Energy Storage Center — Contracted · Storage · CA · 500 MW · 13.9 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Solar Star California, XLI, LLC

Power plant · Solar

Key facts

Power plant · Solarran 31% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
147,197 MWh
Grid
220 kV to Southern California Edison Co (CISO)
Location
Kern County, California
Operated by
MN8 Energy LLC

Output

Net generation MWh by year, 2016 to 2026

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
10 years since 2016
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805531
Location id
L100000804800
Eia plant ids
60591
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
220
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 2025502,236
Capacity factor, 20250.311
Net generation (MWh), 2025147,197
Balancing authority codeCISO

Solar array

Array area (acres)
121.1
AC capacity (MW)
54
DC capacity (MW)
67.4
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2016

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
MN8 Energy LLC Operator EIA-860M
Solar Star California, XLI, LLC Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Rosamond South II Under construction Storage 2.7 mi 140
Solar Star 3 Under construction Solar + storage 3.9 mi 24
Solar Star 4 Under construction Solar + storage 3.9 mi 24
Camino Solar Hybrid Postponed Storage 7.1 mi 11
Alpine Solar Withdrawn Solar 7.5 mi 66
Syracuse and Tours Renewable Energy Permitted Solar + storage 8.9 mi 80
Gaskell West Storage 1, LLC Under construction Storage 9.1 mi 21.6
Antelope Solar Farm Postponed Solar 9.8 mi 20
Portal Ridge Solar A, LLC Postponed Solar 11.2 mi 19
Neenach Solar Center Postponed Solar 12.3 mi 1.5
Windhub Solar B, LLC Under construction Solar 13.7 mi 26.4
Willow Rock Energy Storage Center Contracted Storage 13.9 mi 500

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 19, 2026Source: California ISO

Attribution