Show on map
- Combustion
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Operating
SSI West Riverside Landfill LLC: location and 28 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
SSI West Riverside Landfill LLC
Power plant · Solar
Key facts
Power plant · Solarran 19% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2020
- Net generation, 2025
- 4,066 MWh
- Grid
- 33 kV to Pacific Gas & Electric Co. (LDWP)
- Location
- Riverside County, California
- Operated by
- Standard SolarSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 6 years since 2020
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 13,873 |
| Capacity factor, 2025 | 0.186 |
| Net generation (MWh), 2025 | 4,066 |
| Balancing authority code | LDWP |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
USGS maps the center of this array 2.0 mi from the point this page maps the plant at.
- Array area (acres)
- 8.7
- AC capacity (MW)
- 2.5
- DC capacity (MW)
- 3.1
- Mounting
- Single-axis tracking
- Site type
- Name includes "landfill" (not on EPA's landfill list)
- Began operating
- 2020
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| CA Riverside 2356 Fleetwood Dr. Under construction | Solar + storage | 2.2 mi | 4 |
| Solar Photovoltaic Project #24 Postponed | Solar | 4.0 mi | 4 |
| CA Bloomington 2551 S Lilac Avenue Micro Under construction | Solar + storage | 5.2 mi | 3 |
| Solar Photovoltaic Project #30 Postponed | Solar | 6.5 mi | 1.5 |
| Solar Photovoltaic Project #14 Postponed | Solar | 9.7 mi | 1.5 |
| Solar Photovoltaic Project #17 Postponed | Solar | 9.7 mi | 0.5 |
| Solar Photovoltaic Project #28 Postponed | Solar | 9.8 mi | 0.5 |
| SunE Redlands Postponed | Solar | 9.9 mi | 1.5 |
| Solar Photovoltaic Project #04 Postponed | Solar | 10.4 mi | 1.5 |
| Solar Photovoltaic Project #10 Postponed | Solar | 10.4 mi | 0.5 |
| Solar Photovoltaic Project #25 Postponed | Solar | 10.7 mi | 4.5 |
| Solar Photovoltaic Project #27 Postponed | Solar | 10.7 mi | 1 |
| Solar Photovoltaic Project #18 Postponed | Solar | 10.7 mi | 0.5 |
| Solar Photovoltaic Project #23 Postponed | Solar | 10.8 mi | 0.5 |
| Amazon - Moreno Valley Postponed | Solar | 10.9 mi | 2.2 |
| Solar Photovoltaic Project #19 Postponed | Solar | 10.9 mi | 5 |
| Roadhouse Energy Center Contracted | Storage | 11.3 mi | 300 |
| Solar Photovoltaic Project #12 Postponed | Solar | 11.5 mi | 0.5 |
| Solar Photovoltaic Project #08 Postponed | Solar | 11.7 mi | 0.5 |
| Solar Photovoltaic Project #09 Postponed | Solar | 12.0 mi | 0.5 |
| Solar Photovoltaic Project #21 Postponed | Solar | 12.1 mi | 2.5 |
| Redlands DC 9 - sline609 Under construction | Solar + storage | 12.1 mi | 5 |
| Perris DC 5 - sline015 Under construction | Solar | 12.2 mi | 1.6 |
| Solar Photovoltaic Project #20 Postponed | Solar | 12.4 mi | 3.5 |
| Solar Photovoltaic Project #31 Postponed | Solar | 13.1 mi | 1 |
| Energy Center Announced | Gas, combustion turbine | 13.4 mi | 0.9 |
| OES Biogas Power Under construction | Biomass | 13.4 mi | 2.6 |
| RCWMD Badlands Landfill Gas Project Postponed | Biomass | 14.4 mi | 1.2 |