Show on map
SV CSG South Dekalb 2 LLC — Power plant · Solar · SV CSG South Dekalb 2 LLCMMH 4 SW corner Mobile crane for picking (Dekalb data centre) — Filed · Large load · IL · 2.0 mi awayRed Maple LRE — Filed · Solar · IL · 95 MW · 2.3 mi awayMMH2 NE corner Mobile crane for picking (Dekalb data centre) — Filed · Large load · IL · 2.6 mi awayOwens Creek Solar — Postponed · Solar · IL · 500 MW · 11.6 mi awaySteward Creek Solar Phase 1 — Announced · Solar · IL · 1,200 MW · 12.5 mi awayALLSTATE DATA CENTER — Built · Large load · IL · 13.6 mi awayTHE NORTHERN TRUST CO — Built · Large load · IL · 13.8 mi awaySV CSG Kingston Solar 1 — Under construction · Solar · IL · 5 MW · 14.2 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

SV CSG South Dekalb 2 LLC

Power plant · Solar

Key facts

Power plant · Solarran 27% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
4,688 MWh
Grid
480 kV to Commonwealth Edison Co (PJM)
Location
DeKalb County, Illinois
Operated by
SV CSG South Dekalb 2 LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2023 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
3 years since 2023
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000839019
Location id
L100000833307
Eia plant ids
65800
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
480
Transmission owner
Commonwealth Edison Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 202515,995
Capacity factor, 20250.268
Net generation (MWh), 20254,688
Balancing authority codePJM

Solar array

Array area (acres)
10.3
AC capacity (MW)
2
DC capacity (MW)
3
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2023

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
MMH 4 SW corner Mobile crane for picking (Dekalb data centre) Filed Large load 2.0 mi
Red Maple LRE Filed Solar 2.3 mi 95
MMH2 NE corner Mobile crane for picking (Dekalb data centre) Filed Large load 2.6 mi
Owens Creek Solar Postponed Solar 11.6 mi 500
Steward Creek Solar Phase 1 Announced Solar 12.5 mi 1,200
ALLSTATE DATA CENTER Built Large load 13.6 mi
THE NORTHERN TRUST CO Built Large load 13.8 mi
SV CSG Kingston Solar 1 Under construction Solar 14.2 mi 5

Sources FAA OE/AAA · EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES

Sources

Attribution