Show on map
Sycamore Canyon - Miguel 230 kV — Transmission linePomerado Energy Storage, LLC — Postponed · Storage · CA · 6 MW · 1.6 mi awayEnerSmart El Cajon BESS — Postponed · Storage · CA · 3 MW · 1.9 mi awayRancho Penasquitos — Under construction · Hydro · CA · 4.3 MW · 5.0 mi awayEnerSmart Murray BESS — Postponed · Storage · CA · 21 MW · 5.9 mi awayAlvarado Hydro Facility — Postponed · Hydro · CA · 1.4 MW · 6.6 mi awayL3 Harris San Diego — Under construction · Solar · CA · 1.6 MW · 7.7 mi awayCA National City Terminal Ave — Under construction · Solar · CA · 1.1 MW · 8.0 mi awayEnerSmart Mesa Heights Sub Station — Under construction · Storage · CA · 3 MW · 8.5 mi awayEnerSmart Imperial Beach BESS — Postponed · Storage · CA · 6 MW · 9.3 mi awayEnterprise BESS — Permitted · Storage · CA · 54.1 MW · 14.8 mi away
  • Clean firm
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Sycamore Canyon - Miguel 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-CA
Owner (as stated)
San Diego Gas Electric

Details

Who’s behind it

Owner
San Diego Gas Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
28
Substations at the ends (as the source names them)
Sycamore Canyon to Miguel
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itsan diego gas electric
HIFLD line ID305562
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Pomerado Energy Storage, LLC Postponed Storage 1.6 mi 6
EnerSmart El Cajon BESS Postponed Storage 1.9 mi 3
Rancho Penasquitos Under construction Hydro 5.0 mi 4.3
EnerSmart Murray BESS Postponed Storage 5.9 mi 21
Alvarado Hydro Facility Postponed Hydro 6.6 mi 1.4
L3 Harris San Diego Under construction Solar 7.7 mi 1.6
CA National City Terminal Ave Under construction Solar 8.0 mi 1.1
EnerSmart Mesa Heights Sub Station Under construction Storage 8.5 mi 3
EnerSmart Imperial Beach BESS Postponed Storage 9.3 mi 6
Enterprise BESS Permitted Storage 14.8 mi 54.1

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution