Texas
Crude oil pipeline
Key facts
Crude oil pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-TX
- Operated by
- SunocoSourceEIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 989
- Units
- 8
All 5 attributes from EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 8 |
| Operator, as the source states it | SUNOCO |
| Mapped segments | 8 |
| Source release | 202001 |
| Pipeline name raw | Texas |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Sources
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, Crude Oil Pipelines (as of January 2020)
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Nacogdoches Power Postponed | Gas, combined cycle | 0.0 km | 925 |
| Amelia Energy Center Postponed | Gas, combined cycle | 0.8 km | 900 |
| Cattlemen Solar II Under construction | Solar | 1.4 km | 200 |
| DATA CENTER PHASE 1 - EARLY WORKS PACKAGE Under construction | Large load | 1.8 km | |
| Chimney Rock BESS Studied | Storage | 1.9 km | 156 |
| OCI Lone Sun Postponed | Solar | 3.3 km | 100 |
| Banita Creek- Spindlepop Solar Under construction | Solar + storage | 3.3 km | 673.9 |
| Holstein 2 Battery Storage Announced | Storage | 3.3 km | 100 |
| Summerhill BESS Announced | Storage | 3.6 km | 143 |
| 1300 luffer crane (Abilene data centre) Filed | Large load | 3.6 km | |
| Yaupon Solar Project (Hybrid) Under construction | Solar + storage | 4.1 km | 300.8 |
| Cattlemen Solar Park Under construction | Solar | 4.5 km | 240 |
| ABILENE DATA CENTER PH3 BLDGS 9-10 Under construction | Large load | 5.2 km | |
| Braswell Solar Studied | Solar | 5.2 km | 42.6 |
| Tiger Solar Under construction | Solar | 5.2 km | 250.9 |
| Tokio Solar Contracted | Solar | 5.4 km | 170.4 |
| LONGHORN DATA CENTER Built | Large load | 5.6 km | |
| GPI WACO Power Under construction | Gas, combustion turbine | 6.8 km | 43.4 |
| Pinecrest Energy Center Postponed | Gas, combined cycle | 6.8 km | 753 |
| Dolce BESS, LLC Studied | Storage | 8.0 km | 100.7 |
| Albatross Solar, LLC Contracted | Solar + storage | 8.5 km | 151.4 |
| Anson 2 Solar Built | Solar | 8.6 km | 200.9 |
| Enbridge Solar (Sequoia II) Under construction | Solar | 8.8 km | 415 |
| Sun Angel ESS Studied | Storage | 8.9 km | 201.5 |
| Funston Solar Under construction | Solar | 9.5 km | 351.1 |
| Two Rivers Solar Postponed | Solar | 9.9 km | 214 |
| Major Oak Power Postponed | Coal | 10.2 km | 600 |
| Peri Peri Solar Postponed | Solar | 11.1 km | 115 |
| Longwing Solar Postponed | Solar | 11.1 km | 140 |
| Brushy Creek Solar LLC Postponed | Solar | 11.2 km | 177 |
| Symank Solar Studied | Solar | 11.2 km | 66.5 |
| Legend Power Station Studied | Gas, other | 11.8 km | 820 |
| Quick Draw Postponed | Wind | 12.0 km | 174 |
| Hayrick BESS Studied | Storage | 12.3 km | 113.9 |
| Darkwood Solar Contracted | Solar + storage | 12.4 km | 302.5 |
| RE Bravepost LLC Postponed | Solar | 12.5 km | 200 |
| Jones City 1 Solar Under construction | Solar | 12.7 km | 215 |
| Tidwell Prairie II Built | Storage | 13.1 km | 203.6 |
| Barton Branch IA Under construction | Storage | 13.1 km | 200 |
| Bee Branch IA Under construction | Storage | 13.3 km | 200 |
| Erath County Solar Contracted | Solar | 13.6 km | 207.4 |
| Orange County Advanced Power Station Under construction | Gas, combined cycle | 13.7 km | 1,306 |
| Indigo Solar & Storage Contracted | Solar + storage | 13.9 km | 390 |
| Segno Solar Station Announced | Solar | 14.4 km | 170 |
| Jones City 2 Solar Under construction | Solar + storage | 14.5 km | 385 |
| Cotton Belle Solar Postponed | Solar | 14.6 km | 80 |
| Rosebud Solar, LLC Postponed | Solar | 14.8 km | 132 |
| Hanson Contracted | Solar | 15.2 km | 398.8 |
| Hackberry Creek Solar Contracted | Solar | 15.2 km | 175.5 |
| Trinity River Solar 1 Filed | Solar | 15.8 km | 150 |
Sources EIA-860M · EPA ICIS-NPDES · ERCOT · FAA OE/AAA · EPA ICIS-Air · Berkeley Lab
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- ERCOT GIS Report (Generator Interconnection Status)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.