Show on map
Thermo Fisher Pleasanton — Power plant · Solar · TotalEnergies Renewables USA LLCNorCal FPV 1 (Pond 2) — Under construction · Solar · CA · 1.8 MW · 3.8 mi awayNorCal FPV 1 — Under construction · Solar · CA · 10 MW · 3.8 mi awayBishop Ranch - BR 3-HH — Under construction · Solar + storage · CA · 1.4 MW · 9.3 mi awayBishop Ranch - BR 3-GG — Under construction · Solar + storage · CA · 1.9 MW · 9.4 mi awayBishop Ranch - BR 3-FF — Under construction · Solar + storage · CA · 1.4 MW · 9.4 mi awayAramis I Solar Project — Under construction · Storage · CA · 100 MW · 9.7 mi awayAramis I Solar Project — Under construction · Solar · CA · 100 MW · 9.7 mi awayFremont CA AutoFactory — Under construction · Solar · CA · 3.8 MW · 11.1 mi awayWaste Management Tri-Cities LFGTE — Postponed · Biomass · CA · 4.8 MW · 11.6 mi awayTres Vaqueros Wind Farms LLC — Withdrawn · Wind · CA · 28.3 MW · 11.8 mi away7999 Gateway Solar — Under construction · Solar · CA · 4.6 MW · 12.1 mi awayGateway#1&2 (Newark CA) — Announced · Solar · CA · 1.1 MW · 12.1 mi awayHAYWARD DATA CENTER — Large load · CA · 12.6 mi awayRooney Ranch — Filed · Wind · CA · 21 MW · 14.2 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Thermo Fisher Pleasanton

Power plant · Solar

Key facts

Power plant · Solarran 6% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Net generation, 2025
1,469 MWh
Grid
25 kV to Pacific Gas & Electric Co. (CISO)
Location
Alameda County, California
Operated by
TotalEnergies Renewables USA LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
1 year since 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001058758
Location id
L100001050991
Eia plant ids
68997
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
25
Transmission owner
Pacific Gas & Electric Co.
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20255,153
Capacity factor, 20250.065
Net generation (MWh), 20251,469
Balancing authority codeCISO

Solar arrays

Array area (acres)
3.5
AC capacity (MW)
1.9
DC capacity (MW)
1.9
Site type
Greenfield
Began operating
2025

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
NorCal FPV 1 (Pond 2) Under construction Solar 3.8 mi 1.8
NorCal FPV 1 Under construction Solar 3.8 mi 10
Bishop Ranch - BR 3-HH Under construction Solar + storage 9.3 mi 1.4
Bishop Ranch - BR 3-GG Under construction Solar + storage 9.4 mi 1.9
Bishop Ranch - BR 3-FF Under construction Solar + storage 9.4 mi 1.4
Aramis I Solar Project × 2 units Under construction Storage 9.7 mi 200
Fremont CA AutoFactory Under construction Solar 11.1 mi 3.8
Waste Management Tri-Cities LFGTE Postponed Biomass 11.6 mi 4.8
Tres Vaqueros Wind Farms LLC Withdrawn Wind 11.8 mi 28.3
7999 Gateway Solar Under construction Solar 12.1 mi 4.6
Gateway#1&2 (Newark CA) Announced Solar 12.1 mi 1.1
HAYWARD DATA CENTER Unknown Large load 12.6 mi
Rooney Ranch Filed Wind 14.2 mi 21

Sources EIA-860M · CAISO · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 18, 2026Source: California ISO
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026

Attribution