Show on map
Tri Cities — Power plant · Biomass · Salt River ProjectIron Mountain Data Center — Large load · AZ · 15.2 km awayPHOENIX DATA CENTER — Large load · AZ · 15.3 km awayAMERICAN AIRLINES - PHX DATA CENTER BLDG 1920 — Large load · AZ · 15.6 km awayMCDOWELL ROAD DATA CENTER — Large load · AZ · 16.9 km awayQTS 40th Street — Large load · AZ · 17.1 km awayStack Data Center — Large load · AZ · 17.2 km away11:11 Data Center — Large load · AZ · 19.0 km awayRED HAWK PH 3 (Mesa data centre) — Large load · AZ · 19.7 km awayNTT PH 5 — Large load · AZ · 20.3 km awayEdgeconnex — Large load · AZ · 21.0 km awayCPUS WEST FRYE ROAD, LP — Large load · AZ · 21.5 km awayCOMARCH PHOENIX DATA CENTER — Large load · AZ · 22.0 km awayNDA MESA DATA CENTER — Large load · AZ · 23.1 km awayEdged Data Center — Large load · AZ · 23.1 km awayMesa Data Center — Large load · AZ · 23.4 km awayNTT PH1 DATA CENTER — Large load · AZ · 23.7 km awayEdgeCore — Large load · AZ · 23.8 km awayNTT Ph4 POINT 2 — Large load · AZ · 23.9 km awayCYRUSONE - CHANDLER — Large load · AZ · 24.0 km awayAmex Odyssey (Phoenix data centre) — Large load · AZ · 24.0 km awayDIGITAL REALTY TRUST CHANDLER — Large load · AZ · 24.2 km awayThistle Data Center Crane — Large load · AZ · 24.4 km awayALIGNED PHX-04 DATA CENTER — Large load · AZ · 24.6 km awayPHX06 Data Center — Large load · AZ · 24.9 km away
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Biomass

Key facts

Power plant · Biomassran 47% of 2014 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2001
Net generation, 2014
20,506 MWh
Grid
12 kV to Salt River Project (SRP)
Location
Maricopa County, Arizona

Output

Net generation MWh by year, 2002 to 2015
Fuel burned MMBtu by year, 2002 to 2015
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
25 years since 2001
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110013331215
NAICS code
562212
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1003229
Balancing authority codeSRP

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
July 2015
Capacity retired
5 MW
Generators retired
5
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
TC1Landfill Gas1 MWRetiredJuly 2015
TC2Landfill Gas1 MWRetiredJuly 2015
TC3Landfill Gas1 MWRetiredJuly 2015
TC4Landfill Gas1 MWRetiredJuly 2015
TC5Landfill Gas1 MWRetiredJuly 2015

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Salt River Project
Balancing authority
Salt River Project
NERC region
WECC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Salt River Project Operator EIA-860M
Salt River Pima Maricopa Indian Community Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units TC1, TC2, TC3, TC4, TC5 scheduled to retire, 5 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Iron Mountain Data Center Under construction Large load 15.2 km
PHOENIX DATA CENTER Built Large load 15.3 km
AMERICAN AIRLINES - PHX DATA CENTER BLDG 1920 Under construction Large load 15.6 km
MCDOWELL ROAD DATA CENTER Built Large load 16.9 km
QTS 40th Street Filed Large load 17.1 km
Stack Data Center Filed Large load 17.2 km
11:11 Data Center Filed Large load 19.0 km
RED HAWK PH 3 (Mesa data centre) Filed Large load 19.7 km
NTT PH 5 Filed Large load 20.3 km
Edgeconnex Filed Large load 21.0 km
CPUS WEST FRYE ROAD, LP Built Large load 21.5 km
COMARCH PHOENIX DATA CENTER Built Large load 22.0 km
NDA MESA DATA CENTER Built Large load 23.1 km
Edged Data Center Filed Large load 23.1 km
Mesa Data Center Under construction Large load 23.4 km
NTT PH1 DATA CENTER Under construction Large load 23.7 km
EdgeCore Under construction Large load 23.8 km
NTT Ph4 POINT 2 Filed Large load 23.9 km
CYRUSONE - CHANDLER Built Large load 24.0 km
Amex Odyssey (Phoenix data centre) Filed Large load 24.0 km
DIGITAL REALTY TRUST CHANDLER Built Large load 24.2 km
Thistle Data Center Crane Filed Large load 24.4 km
ALIGNED PHX-04 DATA CENTER Under construction Large load 24.6 km
PHX06 Data Center Filed Large load 24.9 km