Tri Cities: location and 24 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Tri Cities
Power plant · Biomass
Key facts
Power plant · Biomassran 47% of 2014 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2001
- Net generation, 2014
- 20,506 MWh
- Grid
- 12 kV to Salt River Project (SRP)
- Location
- Maricopa County, Arizona
- Operated by
- Salt River Project
Output
- Biomass and waste
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Landfill Gas”
- Age
- 25 years since 2001
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | SRP |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- July 2015
- Capacity retired
- 5 MW
- Generators retired
- 5
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| TC1 | Landfill Gas | 1 MW | Retired | July 2015 |
| TC2 | Landfill Gas | 1 MW | Retired | July 2015 |
| TC3 | Landfill Gas | 1 MW | Retired | July 2015 |
| TC4 | Landfill Gas | 1 MW | Retired | July 2015 |
| TC5 | Landfill Gas | 1 MW | Retired | July 2015 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 12 kV
- Transmission or distribution system owner
- Salt River Project
- Balancing authority
- Salt River Project
- NERC region
- WECC
Transmission lines within 25 km (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Salt River Project | Operator | EIA-860M | ||
| Salt River Pima Maricopa Indian Community | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Units TC1, TC2, TC3, TC4, TC5 scheduled to retire, 5 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Iron Mountain Data Center Under construction | Large load | 15.2 km | |
| PHOENIX DATA CENTER Built | Large load | 15.3 km | |
| AMERICAN AIRLINES - PHX DATA CENTER BLDG 1920 Under construction | Large load | 15.6 km | |
| MCDOWELL ROAD DATA CENTER Built | Large load | 16.9 km | |
| QTS 40th Street Filed | Large load | 17.1 km | |
| Stack Data Center Filed | Large load | 17.2 km | |
| 11:11 Data Center Filed | Large load | 19.0 km | |
| RED HAWK PH 3 (Mesa data centre) Filed | Large load | 19.7 km | |
| NTT PH 5 Filed | Large load | 20.3 km | |
| Edgeconnex Filed | Large load | 21.0 km | |
| CPUS WEST FRYE ROAD, LP Built | Large load | 21.5 km | |
| COMARCH PHOENIX DATA CENTER Built | Large load | 22.0 km | |
| NDA MESA DATA CENTER Built | Large load | 23.1 km | |
| Edged Data Center Filed | Large load | 23.1 km | |
| Mesa Data Center Under construction | Large load | 23.4 km | |
| NTT PH1 DATA CENTER Under construction | Large load | 23.7 km | |
| EdgeCore Under construction | Large load | 23.8 km | |
| NTT Ph4 POINT 2 Filed | Large load | 23.9 km | |
| CYRUSONE - CHANDLER Built | Large load | 24.0 km | |
| Amex Odyssey (Phoenix data centre) Filed | Large load | 24.0 km | |
| DIGITAL REALTY TRUST CHANDLER Built | Large load | 24.2 km | |
| Thistle Data Center Crane Filed | Large load | 24.4 km | |
| ALIGNED PHX-04 DATA CENTER Under construction | Large load | 24.6 km | |
| PHX06 Data Center Filed | Large load | 24.9 km |
Sources EPA ICIS-NPDES · FAA OE/AAA · EPA ICIS-Air