Show on map
Valmont — Power plant · Gas, combustion turbine · Public Service Co of ColoradoORACLE AMERICA - BROOMFIELD CAMPUS — Built · Large load · CO · 7.9 mi awayAMERICAN HONDA MOTORS CO. - DATA CENTER — Built · Large load · CO · 9.3 mi awayJPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL — Built · Large load · CO · 9.9 mi awayFront Range Project — Postponed · Biomass · CO · 1.6 MW · 10.5 mi away
  • Combustion
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 4% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1973
Net generation, 2025
23,038 MWh
Grid
115 kV to Public Service Co of Colorado (PSCO)
Location
Boulder County, Colorado

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
53 years since 1973
Heat rate
14,198 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Xcel Energy Inc
Share pct
100
Gem entity id
E100000001329
Unit ids
G100000110547, G100000403420, G100000403575, G100000403576
Location id
L100000103815
Eia plant ids
6, 477
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000467290
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001463
Fuel burned (MMBtu), 2025327,106
Capacity factor, 20250.044
Heat rate (Btu/kWh), 202514,198.5
Net generation (MWh), 202523,038
Balancing authority codePSCO

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Capacity retired
191.7 MW
Generators retired
1
Next scheduled retirement
December 2028
Capacity scheduled to retire
59.3 MW
Generators scheduled to retire
1
Share of in-service capacity scheduled
100%
Capacity still in service
59.3 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
5Conventional Steam Coal191.7 MWRetiredSeptember 2017
6Natural Gas Fired Combustion Turbine59.3 MWScheduled to retireDecember 2028
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Conventional Steam Coal191.7 MW
Natural Gas Fired Combustion Turbine59.3 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Public Service Co of Colorado
Balancing authority
Public Service Company of Colorado
NERC region
WECC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Public Service Co of Colorado Operator EIA-860M
Xcel Energy Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Unit 6 scheduled to retire, 59.3 MW · EIA-860M
  • Stated Unit 5 scheduled to retire, 191.7 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
ORACLE AMERICA - BROOMFIELD CAMPUS Built Large load 7.9 mi
AMERICAN HONDA MOTORS CO. - DATA CENTER Built Large load 9.3 mi
JPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL Built Large load 9.9 mi
Front Range Project Postponed Biomass 10.5 mi 1.6

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution