Show on map
VOPAK TERMINAL LONG BEACH INC, LONG BEACH — Petroleum product terminalElevate Pier S — Filed · Storage · CA · 70 MW · 1.1 mi awaySan Pedro Public Market (SPPM) — Under construction · Solar · CA · 1.2 MW · 2.9 mi awayWatson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 3.9 mi awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 5.6 mi awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 5.8 mi awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 5.9 mi awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 5.9 mi awayTorrance Dis Ctr 2 - SLLAX100 — Under construction · Solar · CA · 1.4 MW · 7.2 mi awayWestminster Reliability Project, LLC — Under construction · Storage · CA · 110 MW · 13.3 mi awayCobalt — Under construction · Solar + storage · CA · 250 MW · 13.6 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Vopak Terminal Long Beach Inc, Long Beach

Petroleum product terminal

As filed: VOPAK TERMINAL LONG BEACH INC, LONG BEACH

Key facts

Petroleum product terminal Operating
Location
California

Details

Who’s behind it

Owner
Vopak Terminal Long Beach IncSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity not stated

All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Attributes
AttributeValue
Padd5
SiteLONG BEACH
SurveyEIA-815
Owner, as the source states itVOPAK TERMINAL LONG BEACH INC
Source release202109

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Sources

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Elevate Pier S Filed Storage 1.1 mi 70
San Pedro Public Market (SPPM) Under construction Solar 2.9 mi 1.2
Watson Cogeneration Withdrawn Gas, combined cycle 3.9 mi 94.2
Dominguez - SLLAX512 Under construction Solar 5.6 mi 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 5.8 mi 1.2
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 5.9 mi 1.3
Fordyce - SLLAX680 Under construction Solar 5.9 mi 1.3
Torrance Dis Ctr 2 - SLLAX100 Under construction Solar 7.2 mi 1.4
Westminster Reliability Project, LLC Under construction Storage 13.3 mi 110
Cobalt Under construction Solar + storage 13.6 mi 250

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 19, 2026Source: California ISO

Attribution