Voss Taylor: location and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Voss Taylor
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 43% of 2005 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1991
- Net generation, 2005
- 3,793 MWh
- Location
- Wayne County, Michigan
- Operated by
- Voss IndustriesSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 35 years since 1991
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- November 2005
- Capacity retired
- 1 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Natural Gas Internal Combustion Engine | 0.5 MW | Retired | November 2005 |
| 2 | Natural Gas Internal Combustion Engine | 0.5 MW | Retired | November 2005 |
Grid
Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.Transmission lines within 15 mi (10)
- Brownstown 230 kV line
- Crestwood 120 kV line
- Detroit Edison King Road 120 kV line
- Detroit Edison King Road 120 kV line
- Dearborn Industrial Generation 230 kV line
- Detroit Edison King Road 120 kV line
- Trenton Channel - Detroit Edison King Road 120 kV
- Detroit Edison King Road 120 kV line
- Brownstown - Wayne 345 kV
- Brownstown - Wayne 345 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 1, 2 scheduled to retire, 1 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Project Cannoli Data Center Filed | Large load | 7.6 mi | |
| Trenton Channel Energy Center Under construction | Storage | 10.1 mi | 220 |
Sources FAA OE/AAA · EIA-860M · Berkeley Lab
Sources
- FAA OE/AAA
- EIA-860M
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.