WAL2667: location and 17 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
WAL2667
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 1% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2021
- Net generation, 2025
- 92 MWh
- Grid
- 0.5 kV to Oncor Electric Delivery Company LLC (ERCO)
- Location
- Dallas County, Texas
- Operated by
- Walmart Stores Texas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 5 years since 2021
- Unused energy
- 10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 10,022 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 922 |
| Capacity factor, 2025 | 0.009 |
| Heat rate (Btu/kWh), 2025 | 10,021.7 |
| Net generation (MWh), 2025 | 92 |
| Balancing authority code | ERCO |
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| EQUINIX N STEMMONS FREEWAY DALLAS Built | Large load | 12.2 km | |
| EXXONMOBIL DALLAS DATA CENTER Built | Large load | 15.8 km | |
| DA12 (Dallas data centre) Filed | Large load | 16.1 km | |
| TX Dallas 7750 Dynasty Drive Under construction | Solar | 16.9 km | 2.3 |
| Malala Postponed | Storage | 18.7 km | 200 |
| Crane DLR37 (Garland data centre) Filed | Large load | 20.8 km | |
| NTT TX-4 DATA CENTER Under construction | Large load | 20.8 km | |
| RAGINGWIRE DATA CENTER Built | Large load | 21.0 km | |
| SDC DFW-VII DATA CENTER PHASE 2 Built | Large load | 21.4 km | |
| EDGECORE DATACENTER - FUJITSU CAMPUS ADDITION Unknown | Large load | 21.8 km | |
| BANK OF AMERICA - RTX MODULAR DATA CENTER Built | Large load | 22.0 km | |
| QTS - DFW 3 - DC1 Filed | Large load | 23.4 km | |
| Stream Fir Data Center Filed | Large load | 23.5 km | |
| QTS Data Centers 6 and 7 Filed | Large load | 23.5 km | |
| STACK DFW02A (Lancaster data centre) Under construction | Large load | 23.8 km | |
| FLEXENTIAL DATA CENTER EXPANSION Built | Large load | 23.9 km | |
| ALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION Built | Large load | 24.0 km |
Sources EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA · EIA-860M
Sources
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EIA-860M Preliminary Monthly Electric Generator Inventory