Show on map
Westheimer - Clodine 138 kV — Transmission lineImperial Power Plant LLC — Postponed · Gas, reciprocating engine · TX · 12 MW · 4.7 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 10.4 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 10.4 mi awayCrowned Heron 2 - Storage, LLC — Built · Storage · TX · 154.2 MW · 13.2 mi awayJack Fusco Energy Center — Postponed · Gas, combined cycle · TX · 400 MW · 13.9 mi awayBESS TX Camarine - BSHOU001 — Under construction · Storage · TX · 9.9 MW · 14.3 mi away
  • Storage
  • Under construction
  • Operating
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Westheimer - Clodine 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Centerpoint Energy Houston Electric

Details

Who’s behind it

Owner
Centerpoint Energy Houston Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
5
Substations at the ends (as the source names them)
Westheimer to Clodine
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcenterpoint energy houston electric
HIFLD line ID312142
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Imperial Power Plant LLC Postponed Gas, reciprocating engine 4.7 mi 12
Callisto II Energy Center Under construction Storage 10.4 mi 303.2
Pamela Heights I Energy Center Under construction Storage 10.4 mi 101.7
Crowned Heron 2 - Storage, LLC Built Storage 13.2 mi 154.2
Jack Fusco Energy Center Postponed Gas, combined cycle 13.9 mi 400
BESS TX Camarine - BSHOU001 Under construction Storage 14.3 mi 9.9

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution