Show on map
Wilbraham — Power plant · Solar · BWC East Brook, LLCPalmer Renewable Energy — Postponed · Biomass · MA · 42 MW · 9.0 mi awayStony Brook — Postponed · Gas, combined cycle · MA · 422 MW · 9.3 mi awayChicopee BESS — Under construction · Storage · MA · 5 MW · 12.8 mi awayRiverside Holyoke — Postponed · Hydro · MA · 1.1 MW · 12.8 mi awayBelchertown Solar PV + Battery Project — Under construction · Solar + storage · MA · 5.6 MW · 13.6 mi awayHadley Falls — Postponed · Hydro · MA · 3.5 MW · 13.6 mi awayWillington Solar One, LLC — Under construction · Solar · CT · 2 MW · 13.9 mi awayHolyoke MA BESS 1 — Under construction · Storage · MA · 5 MW · 14.4 mi away
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 16% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
5,553 MWh
Grid
13 kV to Massachusetts Electric Co (ISNE)
Location
Hampden County, Massachusetts
Operated by
BWC East Brook, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2020 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
6 years since 2020
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000818642
Location id
L100000815756
Eia plant ids
64417
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Massachusetts Electric Co
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 202518,948
Capacity factor, 20250.159
Net generation (MWh), 20255,553
Balancing authority codeISNE

Solar arrays

Array area (acres)
10.4
AC capacity (MW)
4
DC capacity (MW)
5
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2020

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Palmer Renewable Energy Postponed Biomass 9.0 mi 42
Stony Brook Postponed Gas, combined cycle 9.3 mi 422
Chicopee BESS Under construction Storage 12.8 mi 5
Riverside Holyoke Postponed Hydro 12.8 mi 1.1
Belchertown Solar PV + Battery Project Under construction Solar + storage 13.6 mi 5.6
Hadley Falls Postponed Hydro 13.6 mi 3.5
Willington Solar One, LLC Under construction Solar 13.9 mi 2
Holyoke MA BESS 1 Under construction Storage 14.4 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution