Show on map
Wylie — Power plant · Hydro · Duke Energy Carolinas, LLCQTS-CLT1-DC2 Crane — Filed · Large load · SC · 5.7 mi awaySediver — Postponed · Gas, combined cycle · SC · 520 MW · 10.9 mi awayAllen 2 BESS — Announced · Storage · NC · 167 MW · 11.8 mi away
  • Clean firm
  • Storage
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Hydro

Key facts

Power plant · Hydroran 19% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1925
Net generation, 2025
98,649 MWh
Grid
100 kV to Duke Energy Carolinas, LLC (DUK)
Location
York County, South Carolina
Operated by
Duke Energy Carolinas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
101 years since 1925
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001027566
Location id
L100001023361
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
100
Transmission owner
Duke Energy Carolinas, LLC
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 2025336,588
Capacity factor, 20250.188
Net generation (MWh), 202598,649
Balancing authority codeDUK

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
QTS-CLT1-DC2 Crane Filed Large load 5.7 mi
Sediver Postponed Gas, combined cycle 10.9 mi 520
Allen 2 BESS Announced Storage 11.8 mi 167

Sources FAA OE/AAA · EIA-860M

Sources

  • FAA OE/AAAOpen license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution