Yahoo! - HQ — Power plant · Gas, other · Bloom Energy888 Ross Data Center — Filed · Large load · CA · 1.1 mi awayEDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT — Large load · CA · 4.0 mi awaySV8 DATA CENTER — Large load · CA · 4.0 mi awayEdgecore -3580 — Filed · Large load · CA · 4.0 mi awayVANTAGE DATA CENTERS MANAGEMENT CO , LLC — Large load · CA · 4.1 mi awayPRIME DATA CENTERS — Built · Large load · CA · 4.8 mi awayKifer BESS 1 — Under construction · Storage · CA · 50 MW · 4.9 mi away4054 Digital Realty — Built · Large load · CA · 5.1 mi away1200 Memorex Skybox Data Center — Filed · Large load · CA · 5.1 mi awaySKYBOX DATA CENTER — Built · Large load · CA · 5.5 mi awaySJC02 & SJC03 DATA CENTER — Large load · CA · 5.5 mi awayLBA Data Center West — Filed · Large load · CA · 5.5 mi awayWaste Management Tri-Cities LFGTE — Postponed · Biomass · CA · 4.8 MW · 6.1 mi awayFremont CA AutoFactory — Under construction · Solar · CA · 3.8 MW · 6.9 mi away7999 Gateway Solar — Under construction · Solar · CA · 4.6 MW · 7.4 mi awayDC-N (San Jose data centre) — Filed · Large load · CA · 8.8 mi awayGateway#1&2 (Newark CA) — Announced · Solar · CA · 1.1 MW · 8.9 mi awayData Center — Filed · Large load · CA · 9.6 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Yahoo! - HQ

Power plant · Gas, other

Key facts

Power plant · Gas, otherran 10% of 2024 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2014
Net generation, 2024
927 MWh
Grid
0.5 kV to Pacific Gas & Electric Co (CISO)
Location
Santa Clara County, California
Operated by
Bloom Energy

Output

Net generation MWh by year, 2014 to 2024
Fuel burned MMBtu by year, 2014 to 2024
  • Gas

Operations detail

Details

Who’s behind it

Owner
Yahoo!

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, other source: “Other Natural Gas”
Age
12 years since 2014
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
July 2024
Capacity retired
1.1 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
YAH00Other Natural Gas1.1 MWRetiredJuly 2024

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
0 kV
Transmission or distribution system owner
Pacific Gas & Electric Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
  • KEN-OKJ 60 kV CAISO · 60 kV · 1 request nearby, nearest 4.9 mi
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Bloom Energy Operator EIA-860M
Yahoo! Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • Stated Unit YAH00 scheduled to retire, 1.1 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
888 Ross Data Center Filed Large load 1.1 mi
EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT Unknown Large load 4.0 mi
SV8 DATA CENTER Unknown Large load 4.0 mi
Edgecore -3580 Filed Large load 4.0 mi
VANTAGE DATA CENTERS MANAGEMENT CO , LLC Unknown Large load 4.1 mi
PRIME DATA CENTERS Built Large load 4.8 mi
Kifer BESS 1 Under construction Storage 4.9 mi 50
4054 Digital Realty Built Large load 5.1 mi
1200 Memorex Skybox Data Center Filed Large load 5.1 mi
SKYBOX DATA CENTER Built Large load 5.5 mi
SJC02 & SJC03 DATA CENTER Unknown Large load 5.5 mi
LBA Data Center West Filed Large load 5.5 mi
Waste Management Tri-Cities LFGTE Postponed Biomass 6.1 mi 4.8
Fremont CA AutoFactory Under construction Solar 6.9 mi 3.8
7999 Gateway Solar Under construction Solar 7.4 mi 4.6
DC-N (San Jose data centre) Filed Large load 8.8 mi
Gateway#1&2 (Newark CA) Announced Solar 8.9 mi 1.1
Data Center Filed Large load 9.6 mi

Sources FAA OE/AAA · EPA ICIS-NPDES · EPA ICIS-Air · EIA-860M · CAISO

Sources

  • FAA OE/AAAOpen license · retrieved Nov 13, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO

Attribution