Show on map
Yellow Pine II — Power plant · Solar · Yellow Pine Solar II, LLCRough Hat — Contracted · Solar + storage · NV · 200 MW · 2.9 mi awayPurple Sage Energy Center — Contracted · Solar + storage · NV · 400 MW · 3.3 mi awayRough Hat 2 — Contracted · Solar + storage · NV · 200 MW · 6.3 mi awayHidden Hills Solar Plant 2 — Postponed · Solar thermal · CA · 250 MW · 8.9 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Yellow Pine II

Power plant · Solar

Key facts

Power plant · Solarran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
373,638 MWh
Grid
230 kV to Valley Electric Assn, Inc (NEVP)
Location
Clark County, Nevada
Operated by
Yellow Pine Solar II, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
2 years since 2024
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001019289, G100001062348
Location id
L100001017302
Eia plant ids
67091
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
230
Transmission owner
Valley Electric Assn, Inc
Balancing authority code
NEVP
Balancing authority name
Nevada Power Company
Fuel burned (MMBtu), 20251,325,853
Capacity factor, 20250.203
Net generation (MWh), 2025373,638
Balancing authority codeNEVP

Solar arrays

Array area (acres)
598.9
AC capacity (MW)
60
DC capacity (MW)
60
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2024

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Rough Hat Contracted Solar + storage 2.9 mi 200
Purple Sage Energy Center Contracted Solar + storage 3.3 mi 400
Rough Hat 2 Contracted Solar + storage 6.3 mi 200
Hidden Hills Solar Plant 2 Postponed Solar thermal 8.9 mi 250

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution