Substations and line taps where queued projects connect

Grid connection points

Where queued projects connect to the grid, as each queue names it: a substation bus or a line tap. A project connects at the point; it is not built there.

Totals count only projects this page may show; a project withheld under its source license, or not yet published, is not in any number here. Spellings of one point in one queue are grouped by a documented rule; points are never merged across queues. Methodology.

3,569 points

Grid connection points matching the current filters, sorted by active queued MW, largest first.
Point. Sort by name, A to Z Queue Kind Voltage. Sort by voltage, largest first Jurisdiction Active MW, sorted descending. Sort by active queued MW, smallest first Active projects. Sort by active projects, largest first Withdrawn. Sort by withdrawn projects, largest first Built. Sort by built projects, largest first Leading technologies
Alverdiscott 400kV Substation NESO Substation 400 kV GB 13,316 MW active 15 active projects 0 withdrawn 0 built Offshore wind, Solar + storage, Storage
Creyke Beck 400kV Substation NESO Substation 400 kV GB 7,578.4 MW active 6 active projects 0 withdrawn 0 built Gas, combined cycle, Offshore wind, Solar + storage
Grimsby West 400kV Substation NESO Substation 400 kV GB 6,555 MW active 7 active projects 0 withdrawn 0 built Gas, combined cycle, Solar + storage, Storage
Trent Valley South Connection Node D 400kV Substation NESO Substation 400 kV GB 6,420 MW active 4 active projects 0 withdrawn 0 built Gas, combined cycle, Solar + storage, Storage
East Claydon 400kV Substation NESO Substation 400 kV GB 6,175 MW active 7 active projects 0 withdrawn 0 built Solar + storage, Storage
Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B ERCOT Line tap 345 kV US-TX 5,732.9 MW active 8 active projects 0 withdrawn 0 built Gas, combined cycle, Solar
Longside 400kV Substation NESO Substation 400 kV GB 5,500 MW active 5 active projects 0 withdrawn 0 built Offshore wind, Storage
Trent Valley South Connection Node C 400kV Substation NESO Substation 400 kV GB 5,388.9 MW active 11 active projects 0 withdrawn 0 built Solar + storage, Storage
Necton 400kV Substation NESO Substation 400 kV GB 5,188 MW active 6 active projects 0 withdrawn 1 built Offshore wind, Solar + storage, Storage
Cheshire Connection Node A 400kV Substation NESO Substation 400 kV GB 5,130 MW active 4 active projects 0 withdrawn 0 built Gas, combined cycle, Solar + storage
South Anglia Connection Node C 400kV Substation NESO Substation 400 kV GB 4,874 MW active 5 active projects 0 withdrawn 0 built Solar + storage, Storage, Solar
Trent Valley South Connection Node B 400kV Substation NESO Substation 400 kV GB 4,870 MW active 9 active projects 0 withdrawn 0 built Storage, Solar + storage
Branxton 400kV Substation NESO Substation 400 kV GB 4,676.6 MW active 5 active projects 0 withdrawn 0 built Offshore wind, Storage, Solar + storage
Norwich Main 400kV Substation NESO Substation 400 kV GB 4,435 MW active 4 active projects 0 withdrawn 0 built Wind + storage, Offshore wind, Solar + storage
Navenby 400kV Substation NESO Substation 400 kV GB 4,369.9 MW active 7 active projects 0 withdrawn 0 built Solar + storage, Storage
Birkhill Wood 400kV Substation NESO Substation 400 kV GB 4,350 MW active 3 active projects 0 withdrawn 0 built Offshore wind
Drax 400kV Substation NESO Substation 400 kV GB 4,306 MW active 2 active projects 0 withdrawn 1 built Biomass, Solar
23908 Deaf Smith station 345 kV ERCOT Substation 345 kV US-TX 4,139.7 MW active 5 active projects 0 withdrawn 0 built Wind, Gas, reciprocating engine, Solar
Sussex and Romney Connection Node A 400kV Substation NESO Substation 400 kV GB 4,041.7 MW active 11 active projects 0 withdrawn 0 built Solar + storage, Storage
North Anglia Connection Node B 400kV Substation NESO Substation 400 kV GB 3,850 MW active 6 active projects 0 withdrawn 0 built Solar + storage, Storage
Hawthorn Pit 400kV Substation NESO Substation 400 kV GB 3,831 MW active 5 active projects 0 withdrawn 0 built Offshore wind, Solar + storage, Storage
North Anglia Connection Node A 400kV NESO Substation 400 kV GB 3,809.9 MW active 7 active projects 0 withdrawn 0 built Solar + storage, Storage
#3308 Pin Oak 345KV ERCOT Substation 345 kV US-TX 3,789 MW active 3 active projects 0 withdrawn 0 built Gas, combined cycle
Tap 345 kV BUS #1048 Tonkawa - BUS #11050 Dusty Road ERCOT Line tap 345 kV US-TX 3,716.7 MW active 3 active projects 0 withdrawn 0 built Gas, combined cycle, Wind
Teeside Connection Node B NESO Substation — GB 3,600 MW active 1 active project 0 withdrawn 0 built Gas, combined cycle
High Marnham 400kV Substation NESO Substation 400 kV GB 3,595.9 MW active 8 active projects 0 withdrawn 0 built Solar + storage, Storage, Solar
East Kent connection node A 400kV Substation NESO Substation 400 kV GB 3,520 MW active 7 active projects 0 withdrawn 0 built Solar + storage, Storage
Greens 400kV Substation NESO Substation 400 kV GB 3,500 MW active 2 active projects 0 withdrawn 0 built Offshore wind
Bodelwyddan 400kV Substation NESO Substation 400 kV GB 3,468.4 MW active 5 active projects 0 withdrawn 0 built Offshore wind, Solar + storage, Storage
Chickerell 400kV Substation NESO Substation 400 kV GB 3,450 MW active 4 active projects 0 withdrawn 1 built Solar + storage, Storage
West Anglia Connection Node F 400kV Substation NESO Substation 400 kV GB 3,429 MW active 6 active projects 0 withdrawn 0 built Solar + storage, Solar
Hurlie 400kV substation NESO Substation 400 kV GB 3,408 MW active 3 active projects 0 withdrawn 0 built Offshore wind
Feckenham 400kV Substation NESO Substation 400 kV GB 3,375 MW active 7 active projects 0 withdrawn 0 built Solar + storage, Storage
Sizewell 400kV Substation NESO Substation 400 kV GB 3,340 MW active 1 active project 0 withdrawn 1 built Nuclear
Shurton 400kV Substation NESO Substation 400 kV GB 3,340 MW active 1 active project 0 withdrawn 0 built Nuclear
Banniskirk 400kV Substation NESO Substation 400 kV GB 3,258 MW active 2 active projects 0 withdrawn 0 built Offshore wind
Delaney-Colorado River 500 kV Line CAISO Line tap 500 kV US-AZ 3,200 MW active 1 active project 6 withdrawn 1 built Solar + storage
Blyth 400kV Substation NESO Substation 400 kV GB 3,200 MW active 3 active projects 0 withdrawn 0 built Offshore wind, Storage
Daines 400kV Substation NESO Substation 400 kV GB 3,129.9 MW active 4 active projects 0 withdrawn 0 built Storage, Solar + storage
Peterhead 400kV Substation NESO Substation 400 kV GB 3,110 MW active 4 active projects 0 withdrawn 0 built Offshore wind, Storage
Biggleswade 400kV Substation NESO Substation 400 kV GB 3,055.9 MW active 7 active projects 0 withdrawn 0 built Solar + storage, Storage
#60404 Solstice Substation 345 kV ERCOT Substation 345 kV US-TX 3,009.4 MW active 5 active projects 0 withdrawn 0 built Gas, combustion turbine, Storage, Solar
Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit ERCOT Line tap 345 kV US-TX 3,009.2 MW active 3 active projects 0 withdrawn 0 built Gas, reciprocating engine, Solar, Wind
Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line ERCOT Line tap 345 kV US-TX 3,008.3 MW active 3 active projects 0 withdrawn 0 built Gas, reciprocating engine, Solar, Wind
Trout Canyon Substation 230 kV CAISO Substation 230 kV US-NV 3,000 MW active 9 active projects 0 withdrawn 0 built Solar + storage
Eggborough 400kV Substation NESO Substation 400 kV GB 3,000 MW active 2 active projects 0 withdrawn 0 built Gas, combined cycle, Storage
Cilfynydd 400kV Substation NESO Substation 400 kV GB 2,997.7 MW active 9 active projects 0 withdrawn 0 built Solar + storage, Storage, Solar
Drakelow 400kV Substation NESO Substation 400 kV GB 2,994 MW active 7 active projects 0 withdrawn 0 built Solar + storage, Storage, Gas, combined cycle
Nursling 400kV Substation NESO Substation 400 kV GB 2,980 MW active 3 active projects 0 withdrawn 1 built Gas, combined cycle, Storage, Solar + storage
345kV 8318 RIOHONDO7A Substation ERCOT Substation 345 kV US-TX 2,971.8 MW active 3 active projects 0 withdrawn 0 built Gas, combined cycle