Substation
Key facts
Substation- Voltage
- 400 kV
- Capacity queued
- 5,500 MW, 5 active projects
- Queue
- NESO
- Kind
- Substation
- Voltage
- 400 kV
- Bus number
- —
- Jurisdiction
- GB
- Substation
- —
- Active queued (MW)
- 5,500 across 5 projects
- Withdrawn or cancelled (MW)
- 0 across 0
- Built (MW)
- 0 across 0
About this point
A grid connection point as NESO Transmission Entry Capacity (TEC) Register names it. Projects connect here; they are not necessarily built here. Totals count only the projects listed under Projects.
By technology
| Technology | Active MW | Active projects | All projects |
|---|---|---|---|
| Offshore wind | 4,900 | 3 | 3 |
| Storage | 600 | 2 | 2 |
Projects connecting here
- Filed Marram Wind Offshore Wind Farm
- Studied Muir Mhor Offshore Wind Farm
- Filed Broadshore Offshore Wind Farm
- Filed Netherton BESS
- Filed Netherton Hub Bess
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data
Sources
- NESO Transmission Entry Capacity (TEC) RegisterSupported by National Energy SO Open Data