Tap 345-kV 7040 Austrop to 7042 Zorn

Open in Projects

Line tap

Key facts

Line tap
Voltage
345 kV
Capacity queued
827.7 MW, 3 active projects
Queue
ERCOT
Kind
Line tap
Voltage
345 kV
Bus number
—
Jurisdiction
US-TX
Substation
—
Active queued (MW)
827.7 across 3 projects
Withdrawn or canceled (MW)
0 across 0
Built (MW)
0 across 0
About this point

A grid connection point as ERCOT GIS Report (Generator Interconnection Status) names it. Projects connect here; they are not necessarily built here. Totals count only the projects listed under Projects.

By technology

Projects at this point by technology, largest active capacity first.
Technology Active MW Active projects All projects
Gas, combined cycle 506.4 1 1
Solar 201.3 1 1
Storage 120 1 1

Projects connecting here

All 3 in Projects