Tap 69kV 60386 Heartland to 6363 Yellow Jacket

Open in Projects

Line tap

Key facts

Line tap
Voltage
69 kV
Capacity queued
91 MW, 1 active project
Queue
ERCOT
Kind
Line tap
Voltage
69 kV
Bus number
—
Jurisdiction
US-TX
Substation
—
Active queued (MW)
91 across 1 project
Withdrawn or cancelled (MW)
0 across 0
Built (MW)
0 across 0
About this point

A grid connection point as ERCOT GIS Report (Generator Interconnection Status) names it. Projects connect here; they are not necessarily built here. Totals count only the projects listed under Projects.

By technology

Projects at this point by technology, largest active capacity first.
Technology Active MW Active projects All projects
Solar 91 1 1

Projects connecting here

All 1 in Projects

Sources

1 source