Line tap
Key facts
Line tap- Voltage
- 138 kV
- Capacity queued
- 217.2 MW, 1 active project
- Queue
- ERCOT
- Kind
- Line tap
- Voltage
- 138 kV
- Bus number
- —
- Jurisdiction
- US-TX
- Substation
- —
- Active queued (MW)
- 217.2 across 1 project
- Withdrawn or cancelled (MW)
- 0 across 0
- Built (MW)
- 0 across 0
About this point
A grid connection point as ERCOT GIS Report (Generator Interconnection Status) names it. Projects connect here; they are not necessarily built here. Totals count only the projects listed under Projects.
By technology
| Technology | Active MW | Active projects | All projects |
|---|---|---|---|
| Storage | 217.2 | 1 | 1 |
Projects connecting here
- Contracted Pez Rojo BESS
Sources
1 sourceSources ERCOT